SuperCO2 Data Center System: 30 MW Prime Power Plant
A complete natural-gas power plant for an AI data center, built from 64 identical supercritical CO2 turbine modules. It delivers 30 MW straight onto an 800 VDC bus, with no transformers, no medium-voltage switchgear and no AC-to-DC conversion between the generator and the rack.
Four pods. Sixty-four modules. One DC bus.
Each furnace pod burns pipeline natural gas in four low-NOx burners and heats the CO2 coils of 16 HX-500 power modules. Every module turns that heat into 534 kW of electricity, rectifies it to 800 VDC in its own cabinet, and feeds the pod bus. Four pods give a 30 MW plant that keeps running at about 75% with a whole pod out of service.
- Native 800 VDC output for next-generation AI racks
- Higher efficiency than the LM2500 class measured at the DC bus
- Load following by switching modules, so efficiency stays near 40% at part load
- Battery storage on each pod bus absorbs AI load steps in milliseconds
- Built from factory modules in shipping containers, outside the gas turbine delivery queue
Measured at the rack bus
Gas turbines generate medium-voltage AC, which loses about 4% passing through a transformer and a solid-state transformer or rectifier on its way to an 800 VDC rack. The SuperCO2 plant rectifies once, inside each module, at 98.5%.
Gas turbine terminal efficiencies (JT25 37.5%, LM2500XPRESS+G4 39.4%) multiplied by 0.985 × 0.975 for conversion to 800 VDC. SuperCO2 figure is from Infinity Turbine's detailed HX-500 design model at ISO 15 °C, to be confirmed by testing.
SuperCO2 30 MW at a glance
| Item | Metric | Imperial / US |
|---|---|---|
| Net output | 30.5 MW at 800 VDC (±400 V) | 40,800 hp |
| Fuel to DC efficiency (ISO) | 40.5% (LHV) | heat rate 9,338 Btu/kWh (HHV) |
| Natural gas | 7,347 Nm³/h | 6.58 MMscf/d · 284 MMBtu/h |
| Power modules | 64 × HX-500 (60 running + 4 spare) | 32 × 40 ft containers |
| Furnace pods | 4 × 8.1 MW DC, 4 × 5.0 MW burners each | 17 MMBtu/h per burner |
| Working fluid | CO2, 650 °C, 275 bar | 1,202 °F, 3,990 psia |
| NOx / CO2 | ≤ 2.5 ppm with SCR · ≈ 0.50 t/MWh | ≈ 1,100 lb/MWh |
| Water consumption | None (optional adiabatic assist) | — |
| Plot area | ≈ 87 × 49 m (0.43 ha) | ≈ 285 × 160 ft (1.1 acre) |
| Energy storage | 4 × 2 MWh battery on the pod buses | — |
Three oil-free rotors, two recuperators, one rectifier
Each 5.4 × 2.2 m skid carries a complete recompression Brayton power unit. Two containers' worth of modules sit beside each furnace, so the 650 °C piping stays short.
- Main compressor spool, 120,000 rpm, on CO2 foil bearings
- Two-stage recompressor spool, 110,000 rpm
- Power turbine–generator: two Ø108 mm stages, 534 kW PM generator at 48,000 rpm (800 Hz), magnetic bearings, dry gas seals
- Printed-circuit recuperators: Alloy 617 high-temperature unit, 316L low-temperature unit
- 800 VDC SiC active rectifier with solid-state DC breaker
- Reheat to 650 °C before the power turbine
Burner, coils and 800 VDC electronics
5.0 MW low-NOx burner
Staged-fuel burner with swirl register and refractory quarl, firing on 485 °C preheated air. ≤ 9 ppm NOx at the burner, ≤ 2.5 ppm after SCR.
650 °C heater and reheat coils
Inconel 740H radiant panels and Alloy 625 convection banks heat each module's CO2 to 650 °C. The combustion gas never touches the working fluid.
800 VDC rectifier
550 kW silicon-carbide active front end, 98.5% efficient, that also controls generator speed and torque. No transformer, no inverter.
30 MW plant performance by turbine inlet temperature
| Turbine inlet | Net output, 60 modules | Fuel → 800 VDC | Heat rate Btu/kWh (HHV) | Gas MMBtu/h (HHV) | Gas MMscf/d |
|---|---|---|---|---|---|
| 500 °C (932 °F) | 24.6 MW | 33.8% | 11,183 | 275 | 6.37 |
| 550 °C (1022 °F) | 26.7 MW | 36.3% | 10,424 | 278 | 6.44 |
| 600 °C (1112 °F) | 28.6 MW | 38.5% | 9,825 | 281 | 6.51 |
| 650 °C (1202 °F) · optimum | 30.5 MW | 40.5% | 9,338 | 284 | 6.58 |
| 700 °C (1292 °F) | 31.4 MW | 42.3% | 8,933 | 281 | 6.49 |
Fixed hardware, ISO 15 °C ambient, compressor inlet 25 °C. Pipeline gas 1,037 Btu/scf. 650 °C is the optimum: it gives the lowest cost of power and keeps every hot part in code-qualified alloys with margin.
Fuel use and cost, 30 MW at 650 °C
| Delivered gas price | Fuel cost per hour | Per year (8,000 h) | Fuel cost per MWh DC |
|---|---|---|---|
| $3.37/MMBtu (EIA 2026 Henry Hub average) | $958 | $7.7 M | $31 |
| $4.50/MMBtu (typical delivered industrial) | $1,280 | $10.2 M | $42 |
| $6.00/MMBtu (high-cost region) | $1,706 | $13.6 M | $56 |
Against a JT25-class gas turbine at 800 VDC, the plant burns about 11% less gas per MWh delivered to the rack.
Climate and staging
Best in temperate climates
Supercritical CO2 cycles are most efficient in cool air. The plant stays close to its rating up to about 20 °C (68 °F) ambient. On hot sites, adiabatic pre-cooling on the dry coolers or a hot-day rating keeps output predictable.
A three-phase roadmap
Phase 1 is a 600 °C module using existing SuperCO2 500 hardware (about 38.5% to DC). Phase 2 is the 650 °C HX-500 shown here. Phase 3 is a 1 MW module that halves the module count per plant.
Looking for sites, partners and licensees
Infinity Turbine is seeking data center developers, gas suppliers and manufacturing partners for the Phase 1 prototype module and the first pilot pod. A full design package (77 drawing sheets, BOM and data sheet) is available under NDA, and the module and plant designs are available for license.
Performance, emissions and fuel figures are preliminary engineering estimates at ISO conditions (15 °C, sea level) from the Rev A concept design, to be confirmed by detailed design and testing. Gas price cases: EIA November 2026 Short-Term Energy Outlook (Henry Hub $3.37/MMBtu 2026 average) and Infinity Turbine delivered-price assumptions. LM2500 and LM2500XPRESS are products of GE Vernova; JT25 is a product of Jereh Group. Comparisons are for illustration only. See also the SuperCO2 Cluster Mesh concept.