logo

CO2 Heat Pump Water Heater Multifamily Retrofit

PDF Publication Title:

CO2 Heat Pump Water Heater Multifamily Retrofit ( co2-heat-pump-water-heater-multifamily-retrofit )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 031

Appendix A – Major Monitoring and Maintenance Events This appendix provides a table (Table 3) outlining the timeline for major monitoring and maintenance events, and their resolution, at the field site. 1 3 2019 5 2019 7 Feb Mar 20 Tree branch fell on inoperable HPWH3 HPWH1 entered idle status Storm damage Error code indicated possible control board issues† Eventual flow meter replacement in March 2019 New HPWH ordered to replace damaged equipment Issue detected and building maintenance alerted Issue detected and building maintenance alerted. Because of second failure for this unit, factory recommended control board replacement. Part was ordered. Table 3. Major Measurement and Verification Events Event Year Month M&V Observation Event Cause Resolution 2 2018 2019 Dec Jan 2019 Ongoing M&V Equipment trouble shooting; active energy monitoring HPWH3* entered idle status (this had happened several times previously) A faulty flow meter was identified and scheduled for replacement Error code indicated possible control board issues† 4 2019 Mar 7 Faulty flow meter and damaged Sanden replaced See Events 1 and 3 above Resolution to Events 1 and 3 above 6 2019 Apr 11 HPWH1 operable again See Event 5 Building maintenance staff power cycled the equipment so it resumed operation – resolution to Event 5 2019 Apr 22 Error code indicated possible control board issues† 8 2019 May 1 HPWH1 entered idle status Energy monitoring data outage Remote connection to data communication protocols interrupted. Resolved connection issues, and data began logging again within 5 days BONNEVILLE POWER ADMINISTRATION 25

PDF Image | CO2 Heat Pump Water Heater Multifamily Retrofit

co2-heat-pump-water-heater-multifamily-retrofit-031

PDF Search Title:

CO2 Heat Pump Water Heater Multifamily Retrofit

Original File Name Searched:

co2-heat-pump-water-heater-final.pdf

DIY PDF Search: Google It | Yahoo | Bing

CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info

Heat Pumps CO2 ORC Heat Pump System Platform More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP