PDF Publication Title:
Text from PDF Page: 037
Figure 7.9 Attach unit to wall bracket (A) Figure 7.10 Attach unit to wall bracket (B) • Attach the unit to the wall bracket (Figures 7.9 and 7.10). Figure 7.11 Ensure unit is securely seated • Ensure that the unit is securely seated (Figure 7.11). • Fill around the pipe work to seal the opening formed. • Install cover and face plate to unit. Check that all holes through the wall lining are hidden by the installed unit. Figure 7.13 Expose flared pipe ends • Remove tape and expose flared pipe ends for connection to copper piping (Figure 7.13) – see 7.4 Connecting piping to indoor and outdoor units. Do not use flexible drainage hose inside existing walls unless fully accessible – if it becomes kinked, it may block and cause leakage inside the wall. Figure 7.12 Taped pipes, drainage pipe and connection cable through hole • Taped pipes, drainage pipe and connection cable are through the hole to the outside (Figure 7.12). Ensure that the condensate drain is at the bottom of the grouped pipes and that there are no kinks in it. 37PDF Image | Heat pump installation Good Practice Guide
PDF Search Title:
Heat pump installation Good Practice GuideOriginal File Name Searched:
Good_practice_heat_pump_installation.pdfDIY PDF Search: Google It | Yahoo | Bing
CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info
Heat Pumps CO2 ORC Heat Pump System Platform More Info
CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)