PDF Publication Title:
Text from PDF Page: 048
9.3 Nameplate Do not: • connect the isolating switch to the outdoor unit, which means that the unit cannot be isolated from the power • allow contact between wiring and refrigerant pipework • run the main power cable and heat pump system power cable together • allow work to be carried out by an uncertified tradesperson or to be installed without a completion certificate for the electrical works, which may void future insurance loss claims. Attach a nameplate in an accessible location displaying: • manufacturer’s name and/or trademark • type or model designation and serial number • rated voltage • rated frequency • cooling capacity • heating capacity • refrigerant type (designation) and charge. Figure 9.3 Install lockable isolating switch (B) Figure 9.4 Install lockable isolating switch (C) Figure 9.5 Replace service cover to outdoor unit • Attach the isolating switch to the house – not to the outdoor unit. • Provide waterproof protection to the connection as required, such as: – cable gland – flexible conduit. • Replace service cover to outdoor unit when all connections are completed (Figure 9.5). 48PDF Image | Heat pump installation Good Practice Guide
PDF Search Title:
Heat pump installation Good Practice GuideOriginal File Name Searched:
Good_practice_heat_pump_installation.pdfDIY PDF Search: Google It | Yahoo | Bing
CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info
Heat Pumps CO2 ORC Heat Pump System Platform More Info
CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)