logo

Heat pump installation Good Practice Guide

PDF Publication Title:

Heat pump installation Good Practice Guide ( heat-pump-installation-good-practice-guide )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 053

10.6 Quality assurance checklist for auditing Carry out a quality assurance check on completion of installation of a heat pump system. Outdoor unit ❏❏ Is the outdoor unit secure with no likelihood of falling over? ❏❏ Is there any vibration or noise disturbance to owners and/or adjacent properties? ❏❏ Is the area around the unit clear so there is no likelihood that the air supply routes will become blocked? ❏❏ Has the unit been installed to provide future servicing access? ❏❏ Is all the exterior ducting neat and tidy, with all flashing and waterproofing completed? ❏❏ Have all service covers been replaced? ❏❏ Is the unit clearly labelled? ❏❏ Have the installer’s checklists been sighted? Indoor unit ❏❏ Is the indoor unit secure and does not vibrate? ❏❏ Has the test run been carried out? ❏❏ Is the unit neatly installed with no pipework or ducting visible? ❏❏ Have the installer’s checklists been sighted? Pipework ❏❏ Is the pipework appropriate for the refrigerant used in the system? ❏❏ Has a leak test been carried out? ❏❏ Was the system evacuated? ❏❏ Is the system charged to a level appropriate for the pipe length? ❏❏ Are the stop valves fully open? ❏❏ Have the installer’s checklists been sighted? Drainage ❏❏ Is the drain hose from the indoor unit properly installed? ❏❏ Has the indoor unit drainage been tested by pouring water into the tray? ❏❏ Has the outdoor drainage pipe been directed away appropriately? Electrical ❏❏ Does the electrical work have an electrical code compliance certificate? ❏❏ Has a copy of the Code of Compliance certificate been given to the owner? ❏❏ Is the unit connected to a separate circuit (if over 5 kW output), hard wired back to the mains distribution board? ❏❏ Is there a circuit breaker in the system and has the circuit been properly labelled on the distribution board? ❏❏ Is the energy rating label on the unit or available for viewing? Instructions to the owner ❏❏ Has the operation of the system been explained to the owner? ❏❏ Does the owner have the operating manual? ❏❏ Has the owner been advised of maintenance and servicing requirements? ❏❏ Does the indoor unit have the energy rating label applied, or available? ❏❏ Has the owner been given a copy of the warranty? 53

PDF Image | Heat pump installation Good Practice Guide

heat-pump-installation-good-practice-guide-053

PDF Search Title:

Heat pump installation Good Practice Guide

Original File Name Searched:

Good_practice_heat_pump_installation.pdf

DIY PDF Search: Google It | Yahoo | Bing

CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info

Heat Pumps CO2 ORC Heat Pump System Platform More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP