logo

QAHV-N560YA-HPB

PDF Publication Title:

QAHV-N560YA-HPB ( qahv-n560ya-hpb )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 067

7. Operating the Unit [1] Initial Operation 1. Make sure the Run/Stop switch that controls the unit on the local control panel is switched off. 2. Switch on the main power. 3. Leave the main power switched on for at least 12 hours before turning on the Run/Stop switch that controls the unit on the on-site control panel to warm up the compressor. (The compressor will not be warmed up if initial settings have not been made. Make sure to make initial settings.) 4. Switch on the Run/Stop switch that controls the unit on the on-site control panel. [2] Daily Operation To start an operation Switch on the Run/Stop switch that controls the unit on the local control panel, or press the ON/OFF button on the remote controller. (*1) Note The unit described in this manual features a circuit that protects the compressor from short-cycling. Once the compressor stops, it will not start up again for up to 10 minutes. If the unit does not start when the ON/OFF switch is turned on, leave the switch turned on for 10 minutes. The unit will automatically start up within 10 minutes. To stop an operation Switch off the Run/Stop switch that controls the unit on the on-site control panel, or press the ON/OFF button on the remote controller. (*1) (*1) Refer to the following pages for how to use the remote controller. IMPORTANT • Keep the main power turned on throughout the operating season, in which the unit is stopped for three days or shorter (e.g., during the night and on weekends). • Unless in areas where the outside temperature drops to freezing, switch off the main power when the unit will not be operated for four days or longer. (Switch off the water circulating pump if the pump is connected to a separate circuit.) • When resuming operation after the main power has been turned off for a full day or longer, follow the steps under “Initial Operation” above. • If the main power was turned off for six days or longer, make sure that the clock on the unit is correct. 67

PDF Image | QAHV-N560YA-HPB

qahv-n560ya-hpb-067

PDF Search Title:

QAHV-N560YA-HPB

Original File Name Searched:

IBIM_WT08219X05_QAHV_N560YA_HPB_ML.pdf

DIY PDF Search: Google It | Yahoo | Bing

CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info

Heat Pumps CO2 ORC Heat Pump System Platform More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP