logo

QAHV-N560YA-HPB

PDF Publication Title:

QAHV-N560YA-HPB ( qahv-n560ya-hpb )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 073

To use demand control on the connected units, make the settings as shown below. (a) To use only connected unit demand control (contact input) without using Power Save on the remote controller Button operation 1 In the Operation setting screen, press the [F1] button to move the cursor to Power Save. Press the [F3] button to select "No". * Refer to the connected unit Instruction Book for details on connected unit demand control. * Do not set the Power Save settings on the remote controller. Refer to the connected unit Instruction Book for details. * Some items are not available for selection on this model. Unit1 FRI Power Save No Schedule No Fan Mode Normal Anti-freeze No Next F1 F2 F3 F4 (b) To use both connected unit demand control (contact input) and Power Save on the remote controller * Exercise control using low values in the demand control settings and Power Save control capacity. When the contact ON and Power Save start times differ, control will be exercised as of the earliest low value. (See the table below.) Table: Control values when Power Save and demand control are both used Period 12:00-6:30 6:30-7:00 7:00-11:30 Power Save value – (100%) – (100%) 50% Connected unit demand control value – (100%) 60% 60% – (100%) Control value actually used 100% 50% 50% 50% Because Power Save is set from 7:00, control begins based on the Power Save setting. Contact OFF 100% While the contact is ON or Power Save is being applied, the maximum capacity will be limited to whichever is the lower value of the Power Save and demand control settings. While the contact is OFF and Power Save is not applied, control will be exercised with the maximum capacity of 100%. The control capacity during periods when Power Save is not set will be 100%. * The maximum frequency is restricted depending on the inputs of maximum demand capacity and maximum low-noise capacity as shown below. 11:30-12:00 50% Power Save time period setting Unit contact input Contact ON Maximum capacity used 100% by the unit Time Capacity setting (%) 100 60 Settable range Set to 0% when the capacity setting is lower than 60%. Not settable Example) When Power Save is from 7:00 to 12:00 with a control capacity of 50%, and contact is ON for the connected unit (capacity: 60%) Power Save starts Power Save ends 50% 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 0 -20 -5 43 Lowest outdoor temperature in a day (oCDB) 73

PDF Image | QAHV-N560YA-HPB

qahv-n560ya-hpb-073

PDF Search Title:

QAHV-N560YA-HPB

Original File Name Searched:

IBIM_WT08219X05_QAHV_N560YA_HPB_ML.pdf

DIY PDF Search: Google It | Yahoo | Bing

CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info

Heat Pumps CO2 ORC Heat Pump System Platform More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP