logo

Reclaim CO2 Hot Water Heat Pump Design

PDF Publication Title:

Reclaim CO2 Hot Water Heat Pump Design ( reclaim-co2-hot-water-heat-pump-design )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 010

Performance 1.11 FINAL INSPECTION AND TEST Submit the work for inspection and test and prove to the satisfaction of the network utility operator that the installation complies with all Acts and Regulations and has been tested for leakage and proved to be sound. Testing should be at the time of completion. Confirm this timing before carrying out any tests. Test and demonstrate the system according to manufacturer's specification. 2 PRODUCTS 2.1 RECLAIM ENERGY CO2 HOT WATER HEAT PUMP Reclaim Energy CO2 hot water heat pump water heater model REHP-CO2 including pipework, refrigerant, cabinet, drain point, filters, coils, controls, and associated water storage cylinder to Apricus NZ Eco Energy requirements, AS/NZS 3832.1.1 and AS/NZS 3832.1.2, with minimum energy performance standards (MEPS) in accordance with AS/NZS 3832.3. Hot water storage cylinder to be Reclaim 300L stainless steel cylinder 7300 Reclaim 300L or alternative stainless steel cylinder with suitable ports. 3 EXECUTION Installation - general 3.1 HANDLE AND STORE Handle and store units, cylinders, pipes, fittings and accessories to avoid damage. Store on site, under cover on a clean level area, stacked to eliminate movement and away from work in progress. Store according to manufacturer's instructions. 3.2 CONCEAL Conceal pipework within the fabric of the building unless detailed otherwise. Satin finish chrome plate exposed work, complete with matching ferrule at the surface penetration. 3.3 CORROSION Separate all metals subject to electrolytic action from each other and from treated timber, concrete and other lime substances by space, painting of surfaces, taping, or separator strips. 3.4 THERMAL MOVEMENT Accommodate movement in pipes resulting from temperature change by the layout of the pipe runs, by expansion joints and by sleeving through penetrations. 3.5 PIPE SIZE Plumber to check and confirm adequate pipe size, incoming mains and meter on site as a part of the installation. Pipe sizing calculation to NZBC G12/AS1, table 4. Installation - general, hot water cylinders 3.6 HOT WATER CYLINDER INSTALLATION - GENERALLY Install hot water cylinders complete to the manufacturer's requirements and to NZBC G12/AS1, 6.11, Water heater installation. Valve-vented systems to NZS 4607. 3.8 SEISMIC RESTRAINTS - WATER HEATING APPLIANCES

PDF Image | Reclaim CO2 Hot Water Heat Pump Design

reclaim-co2-hot-water-heat-pump-design-010

PDF Search Title:

Reclaim CO2 Hot Water Heat Pump Design

Original File Name Searched:

Reclaim-CO2-HWHP-design-guide-v2.pdf

DIY PDF Search: Google It | Yahoo | Bing

CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info

Heat Pumps CO2 ORC Heat Pump System Platform More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP