2007 Concentrating Solar Power USA DOE

PDF Publication Title:

2007 Concentrating Solar Power USA DOE ( 2007-concentrating-solar-power-usa-doe )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 011

for FY 2001 (made in February 2000) to $1.9 million for FY 2002 (made in February 2001) following the NRC’s report. Every year, however, Congress has provided funding levels above DOE’s request and has required DOE to conduct additional assessments of CSP . DOE’s 2002 CSP Report Language in the FY 2002 Energy and Water Development Appropriation Bill directed DOE to “scope out an initiative to fulfill the goal of having 1,000 MW of new parabolic trough, power tower, and dish engine solar capacity supplying the Southwestern U.S. by 2006.”29 In response, DOE prepared a report that summarized the CSP industry’s estimate of the conditions that would be required to build 1,000 MW of new CSP capacity in the Southwest. This report was entitled “Feasibility of 1,000 Megawatts of Solar Power in the Southwest: Report to Congress.”30 Largely based on data from Luz International’s construction of 354 MW of parabolic troughs in California between 1984 and 1990, the solar industry indicated it could build the 1,000 MW in a five-year period if between $1.5 and $2.0 billion in Federal and State financial incentives were available over a 14-year period. The CSP industry felt the technology was ready for large scale deployment. The industry provided a list of possible incentives (e.g., a 30 percent investment tax credit, a 1.7 cent per kWh production tax credit, and a solar energy loan guarantee program) that would enable it to finance and build the solar power plants. DOE concurred in the industry’s ability to build the plants if the incentives were made available, but DOE did not support the Federal government providing the cost of the subsidy that would be required. DOE doubted if it could be done by 2006 because the industry’s proposed incentives required enactment by Congress and state legislatures. Moreover, even if Congress provided the CSP industry’s requested subsidies, significant installations by 2006 were unlikely because of the time required for the incentives to be put in place and for industry to arrange financing and obtain permits. Industry also indicated its opinion that the establishment of 1,000 MW of CSP would enable the establishment of manufacturing capability and provide “learning curve” cost reductions that could bring the cost of CSP to as low as 6 cents/kWh without further incentives.31 The NRC and DOE assessments are in agreement that some level of government intervention would be required for CSP to become economically feasible. Nevertheless, the reports do contain fundamentally different assessments of the future of CSP, with the NRC pessimistic that any CSP development would occur in the next 10 to 20 years and the DOE optimistic that government incentives could spur development in the CSP industry that would make it economically viable in the near future. To resolve the differences between the NRC and DOE studies and to ensure a thorough and rigorous evaluation of the potential of CSP technologies, DOE commissioned a new report in 2002; a detailed technical analysis by an independent engineering firm. DOE also asked an NRC panel to review and comment on a draft report of the independent engineering firm, and this critique constitutes a second NRC report. The engineering firm Sargent and Lundy (S&L) was selected to conduct this analysis on the basis, among other factors, of its independence from the CSP industry and its recognized performance 4

PDF Image | 2007 Concentrating Solar Power USA DOE

PDF Search Title:

2007 Concentrating Solar Power USA DOE

Original File Name Searched:

41233.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)