THE APPLICATION OF KENTUCKY POWER

PDF Publication Title:

THE APPLICATION OF KENTUCKY POWER ( the-application-kentucky-power )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 104

Plant Proper Costs EPC Contnct O\nierFuniislied~uipinent$1760 $5433 $2684 $287 $79 $4188 $5108 $5086 $4185 $2684 $2639 $2684 $2684 OFEand EPCSalesTax Ovmer's Costs Land hnissions Reduction Credits Gas Interconnection Electric Interconnection Net Start-up Fuel Costs Mobilization and Start-up Project Developimnt FinancingFees Owner's Contingency Total Owrnight Costs Interest Dunng Construction Total Capital Costs Soirrcesarid Notes $2 4 $244 $236 -$4 0 $245 $27 8 $73 $49 $20 $25 $244 $244 $236 $23 6 $246 $204 $55 $72 $21 $00 $244 $244 $236 $236 $25 $25 $40 $40 $122 $122 $88 $78 $265 $237 $911 $813 $537 $480 $965 $861 Plant proper costs estimated by Owner's costs estimated in Section 1V.B B. TOTALFIXEDO&MCOSTS Property Tax Insurance O&M Services Asset Management TotilFixedO&MCosts Soiirces arid Notes $0.4 $0.9 $4.5 $4.5 $7.0 $6.5 $3.9 $3.9 $0.1 $0.3 $0.0 $4.5 $4.5 $4.5 $6.7 $6.4 $6.4 $3.9 $3.9 ($171) ($171) $2746 $1760 $161 $48 $13 $160 $155 $17 $27 $80 $52 $157 $531 $31 9 ($171) ($171) $3349 $3334 $1730 $1760 $183 $161 $32 $36 $16 $14 $160 $160 $155 $155 $26 $17 $28 $26 $80 $80 $58 $57 $174 $174 $599 $597 $354 $352 ($171) $2744 $1760 $134 $47 $00 $160 $155 $3562 $188 $52 $1 6 $160 $155 -$2 7 $2 9 $8 0 $60 $181 $621 $370 $658 Table 48 Combined-Cvcle Cmital Costs for 2015/16 COp&_Area CONEArea 1234512345 EMAAC SWMAAC RTO WMAAC DOM M A C SWMAAC RTO WMAAC DOM ($/IC cg ($/IC cg ($/IC cg ($/IC cg ($/IC cg $569 CH2M H1L.L.Engineers, Inc. (201 1). EMAACSWMAAC RTO WMAAC DOM EMAAC SWMAAC RTO WMAAC DOM ($/k w-.v) ($/kw-y) ($/kCV-y) ($/kw-y) ($/kw-y) ($llll!v) ($Ill/yl $0.2 $0.4 $1.8 $1.8 $2.7 $2.5 $1.5 $1.5 $6.1 $6.2 -- ($tIl[V) $0.0 $1.8 $2.6 $1.5 $5.9 ($lll/y) ($nib) $0.1 $0.0 $1.8 $1.8 $2.5 $2.5 $1.5 $1.5 $5.9 $5.7 Property tax, insurance, and asset management costs estimated in Section V. O&M services estimated by Wood Group (201 1) $634 $633 $564 Table 47 and Table 48 contain a summary of the fixed ongoing annual plant costs estimated in Section V for the simple-cycle and combined-cycle reference plants respectively. reported here are the first-year FOM costs for the first operating year starting in 2014/15. Each of these costs increases with inflation over the economic life of the plant. $17 $26 $80 $51 $91 $79 $155 $533 $31 5 $122 $276 $239 $948 $820 $564 $486 $1,004 $868 $122 $88 $266 $914 $539 $968 Table 49 Simple-cycle Fixed O&M Costs CONEArea CONEArea 1234512345 43 $15.7 $15.8 $15.2 $15.1 $14.7 $44 $122 $25 $39 $41 $42 The costs $3.8

PDF Image | THE APPLICATION OF KENTUCKY POWER

PDF Search Title:

THE APPLICATION OF KENTUCKY POWER

Original File Name Searched:

20130423_KIUC_Responses_to_Kentucky_Power_Companys_First_Request_for_Information_Q_1_28.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)