Drilling Down on Geothermal Potential Central America

PDF Publication Title:

Drilling Down on Geothermal Potential Central America ( drilling-down-geothermal-potential-central-america )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 027

Development of geothermal projects 9. Development of geothermal projects is a complex process and involves seven key phases of project development. Because of the high risks and costs involved in the early phases (as discussed below), project developers will need to decide after each phase whether to continue the development. The first three phases are part of project exploration, from early exploration initiatives, to on-site scientific research and test drillings. These activities will confirm or deny the existence of a geothermal reservoir suitable for commercial development. If the results from the first three phases are positive and the geothermal potential is confirmed, phase 4 is initiated with the design of the power plant, including feasibility study, engineering design and financial closure. Phases 5 to 7 involve the actual development of the project, including the drilling of geothermal wells, construction of the pipelines, power plant and its connection to the transmission system, as well as startup and commissioning. A typical full sized geothermal project will take approximately five to seven years to develop. The development could be shortened or prolonged by several years depending on the specific geological conditions, the institutional and regulatory framework under which the project operates, and financing requirements. Characteristics of geothermal energy 10. Geothermal energy has several characteristics that make it appealing for power generation. Geothermal power plants provide base load power with a high capacity factor; modern geothermal power plants can have a capacity factor of 90 percent or higher. They are also an ideal complement to hydroelectric power whose load-following capability allows a power system to serve peak loads. Once a geothermal power plant is up and running, there is little need for fuels, which contributes to low operation and maintenance costs. The multiple uses of geothermal resources, including for power generation, industrial heat, tourism, and agricultural production, can enhance the economics of geothermal projects. 11. Some of the drawbacks of geothermal energy are associated with characteristics of the resource itself. Field depletion is a risk which can be mitigated by designing the geothermal development carefully in order to extract energy at a rate which can extend the useful life of the resource to generate for many years; depending on characteristics of the field, additional wells may have to be drilled every few years (at a significant cost) to sustain the production rate. Additionally, there may be temperature drops of the steam being extracted which can impair the ability to deliver the rated capacity of the power plant. 12. The energy generation costs of geothermal plants are generally low in comparison to other renewable energies. The levelized generation costs for geothermal power range from US$ 40-110 /MWh, meaning it can also be cost competitive with large hydro and thermal generation technologies, as is the case for Central America. 13. The potential environmental and social impacts of geothermal plants are generally small and compare favorably to fossil fuel technologies as well as other types of renewable technologies (Table 2). 4

PDF Image | Drilling Down on Geothermal Potential Central America

drilling-down-geothermal-potential-central-america-027

PDF Search Title:

Drilling Down on Geothermal Potential Central America

Original File Name Searched:

CentralAmerica_Drilling_Down_Geothermal_Potential_Optimized.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP