geothermal energy development in the NWT

PDF Publication Title:

geothermal energy development in the NWT ( geothermal-energy-development-the-nwt )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 018

Background from Class (0–150 kilowatts) to Class 6 (100,000 kilowatts or more). A Class 0 power project requires a Class B Water Licence (which does not require a public hearing), and Class 1-6 power projects require a Class A water licence (which covers use of groundwater and deposit of waste, and requires a public hearing).33,34 Land and water boards also regulate surface land activities (such as construction of a geothermal plant) as specified in the Mackenzie Valley Resource Management Act. A Type A land use permit would be required for the construction of roads, drill pads and camps, and the clearing of land for wells, facilities and fuel storage.35 In the Inuvialuit Settlement Region, land use permits can be obtained from Indian and Northern Affairs Canada, and on Inuvialuit owned lands, from the Inuvialuit Land Administration Office. Land use permit and water use permit applications undergo a preliminary screening to determine if the project is expected to cause significant environmental or social impact. If the environmental or social impacts of a proposed project merit further review, the proposal would be passed on the Mackenzie Valley Environmental Impact Review Board (in the Mackenzie Valley) or the Environmental Impact Review Board (in the Inuvialuit Settlement Region) for an environmental assessment. Environmental assessment can take between one to two years to complete and the land use and water use permits would be issued at the end of the environmental assessment process if the project is approved. Surface access permits for lands within municipal boundaries would be required from the municipality or from the Government of the NWT Department of Municipal and Community Affairs. This would be similar to the access permits that were acquired by the operators of Con and Giant mine for mining activities on land within the boundaries of the City of Yellowknife. 2.4.4.2 Operations Anyone can produce electricity for their own needs, subject to permission of an electrical inspector as per the NWT Electrical Protection Act.36 To connect to the electricity grid system in any community, the producer would need to negotiate with the utility provider in that community. The Northwest Territories Power Corporation, for example, provides power for 27 communities in the territory. An independent power producer would have to set up a purchase agreement with the NWT Power Corporation (NTPC) in order to integrate power from geothermal into the existing power system. Alternatively, a geothermal energy project could be developed and operated by the NTPC or formed through a public-private partnership. 33 Mackenzie Valley Land and Water Board, Activities Requiring a Water Licence (2004). http://www.mvlwb.com/doc/WL%20Criteria%20Nov%202004.pdf 34 Mackenzie Valley Land and Water Board, Guide to Completing Water License Application (2001). http://www.mvlwb.ca/mv/AppForms/Guide%20to%20Completing%20Water%20Use%20Applications.pdf 35 Mackenzie Valley Land and Water Board, Activities Requiring a Land Use Permit (2004). http://www.mvlwb.com/doc/LUP%20Criteria%20Nov%202004.pdf 36 Government of the Northwest Territories, Electrical Protection Act (R.S.N.W.T. 1998, c. E-3) The Pembina Institute 18 Building a regulatory framework for geothermal development in the NWT

PDF Image | geothermal energy development in the NWT

geothermal-energy-development-the-nwt-018

PDF Search Title:

geothermal energy development in the NWT

Original File Name Searched:

building_a_regulatory_framework_for_geothermal_in_the_nwt.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP