logo

geothermal energy development in the NWT

PDF Publication Title:

geothermal energy development in the NWT ( geothermal-energy-development-the-nwt )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 027

Jurisdictional review Exploration permits are for one year and can be extended for up to eight years. A permit carries an obligation to explore for geothermal resources, and gives the holder the right to apply for authorization to drill wells. After a well has been drilled and a plan for production submitted, this can be extended to a lease for 20 years with many renewals. Geoscience exploration (such as drilling a test hole) does not require subsurface rights or land tenure (but does require a geophysical licence). The average auction price for geothermal tenure is $3/ha (versus $2400/ha for oil and gas).86 The Geothermal Resources Act does not address problems that may arise from overdevelopment (such as restrictions on the rate of production or conflicts that may arise from multiple development of a single reservoir).87 The fee for the issuance or renewal of a permit is $500. Yearly rent for a permit is $1/ha for Years 1 to 3, $2/ha for Years 4 to 5, $4/ha for Years 6 to 7, and$5/ha for Years 8+.88 A lease can be issued after a permit holder drills a geothermal well and submits a development plan for the location of a well. A lease is given for 20 years and can be renewed. The fee for issuance of a lease is $200. Yearly rent is $10/ha.89 In 2008, in response to a large increase in requests for geothermal tenure, the government struck a Geothermal Task Force to examine whether change to the tenure system was required in B.C.90 The Task Force was in discussion with industry players, who highlighted that accessibility to Crown land for exploration purposes was difficult, and made requests for fiscal and non-fiscal incentives to support a geothermal industry.91 Despite this process, the government has made no major changes to legislation and regulation in the short term.92 The province did make tenure available in four areas of the province where there was existing interest in geothermal resources.93 Royalties There is currently no royalty system in place in B.C. While the B.C. government feels it is necessary to have public benefit 86 Personal communication, Garth Thoroughgood, Ministry of Energy, October 17, 2010. 87 Jessop et al, “Geothermal Energy In Canada.” 88 Government of B.C., Geothermal Resources Administrative Regulation, Reg. 132/83 O.C. 623/83 (). 89 Ibid. 90 B.C. Energy, Titles Division, “Information Letter 08-09: Geothermal.” http://www.empr.gov.bc.ca/Titles/OGTitles/InfoLetters/IssueDate/Pages/TITLES-08-09.aspx 91 B.C. Energy, Titles Division, “Information Letter 09-01: Geothermal Update.” http://www.empr.gov.bc.ca/TITLES/OGTITLES/INFOLETTERS/ISSUEDATE/Pages/TITLES-09-01.aspx 92 Thoroughgood, “Geothermal Energy in British Columbia.” 93 B.C. Energy, Titles Division, “Information Letter 09-01: Geothermal Update.” The Pembina Institute 27 Building a regulatory framework for geothermal development in the NWT

PDF Image | geothermal energy development in the NWT

geothermal-energy-development-the-nwt-027

PDF Search Title:

geothermal energy development in the NWT

Original File Name Searched:

building_a_regulatory_framework_for_geothermal_in_the_nwt.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP