Innovative Energy Systems Workshop

PDF Publication Title:

Innovative Energy Systems Workshop ( innovative-energy-systems-workshop )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 034

• Other potential benefits of DE are of interest to the facility managers, e.g.: o Most of the Pearl Harbor infrastructure is pre-WWII and needs replacement or upgrading. o Military is also consolidating facilities for greater efficiency. o However, DAGS has already changed-out many chillers, and installed T8 fluorescent lights with electronic ballasts. o Currently facilities managers have no peak demand control. o There are many “ancient” motors and pumps (and also high heat generation). They plan to add cooling. However, trenching to these loads is a concern. o Need to air-condition ships while in dry dock. o Real-time monitoring of cooling use is currently lacking. How best to actually measure a building’s energy use? Need feedback on energy use. Could use a real time energy metering/monitoring system, as would be provided by DE. Drive behavior by measuring use and letting people know this information. • Note: any technical or commercial solutions cannot affect the mission of military facilities. They must support that mission. • Anders Rydaker: DESP maintains on-line communication with each and every customer – every seven minutes, they get a data point. Customers have access to the data. This real-time monitoring helps to keep DE system and customer costs down. • The Navy of course does have some particularly critical cooling loads. An 1,800 ton chiller plant serves a part of the PHNSY loads. They have a computer center with 24/7 operation and cooling needs. • Anders Rydaker: DE systems don’t want to sell the customer too much contracted load, or too little. Customers who have are penalized (for too much cooling demand or for too little Delta T), aren’t happy customers; accordingly, DE systems work closely with their customers to get it right. • Public-Private Partnership (This can include the DE consumers themselves, as it does in St. Paul.) – DE consumer has some buy-in to the system. There is a mutually beneficial relationship. Do need to put in some contract clauses (as in all DE contracts). • Anders Rydaker: DESP has a seven member Board of Directors, three of whom are elected by customers; thus, the customers have a strong voice on the board. • Potential “deal-breaker” issues or items that need to be addressed: o Need money (rebuilding an infrastructure as large as Pearl Harbor is very expensive) o Operating costs may not decrease, because operating budgets don’t include capital allocation. Closing a DE deal usually requires getting the capital guys (and their budgets) together with the operating guys (and their budgets). o Need to do due diligence. o Need to properly present (identify, estimate, and quantify) the benefits 34

PDF Image | Innovative Energy Systems Workshop

PDF Search Title:

Innovative Energy Systems Workshop

Original File Name Searched:

iesw03summary.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)