number was not available from PacifiCorp other than they require a $50,000 deposit and refund what is not used. Since the $50,000 includes larger facilities PacifiCorp gave an off-the-record estimate of $15,000. Construction Construction of the facility involves the generator and related equipment for required power production. With PacifiCorp purchasing the power the geothermal production well site is the preferred site due to existing power transmission lines. A layout of the site is noted in the Appendix. The generator can be purchased directly from UTC Power with a lead time of 16 weeks to delivery. The generator would require a concrete pad with a roof and some passive sound proofing to keep noise levels within Town Standards. An electrical transformer and switching interface will be required to tie into the power grid. A transformer is required since the generator produces power at three phase / 440 volts. The production well is on site as is the pipeline supplying the cooling water. The only piping required is a cooling water return line to the cold water re-injection well/biomass point and back up supply piping from the Utley Well. Pipelines will be located on public right-of-way. New well pumps will be required for the geothermal wells and the cooling water wells due to changes in the new pumping rates and performance. A construction schematic is included in the Appendix. Table 7 - Development Costs Equipment Costs Open Tower Cooling Well Water Cooling Generator Unit Pump Replacement in North Well Pump Replacement Geothermal Well Pump for Utley Well Supply Piping from Utley Well to Production Well Cooling Water Return Line Open Cooling Tower Re-injection Well (Cold Water) Site Work Electrical Tie-in/Switching Transformer $ 370,000.00 $ 8,000.00 $ 30,000.00 $ 15,000.00 $ 50,000.00 $ 60,000.00 $ 133,000.00 $- $ 10,000.00 $ 20,000.00 $ 370,000.00 $ 8,000.00 $ 30,000.00 $ 15,000.00 $ 50,000.00 $ 60,000.00 $- $ $ $ 150,000.00 10,000.00 20,000.00 Total Equipment Costs: Design Costs Engineering Intertie / Connection Study Administration Total Design Costs $ $ $ $ $ 696,000.00 52,000.00 15,000.00 5,000.00 72,000.00 $ $ $ $ $ 713,000.00 42,000.00 15,000.00 5,000.00 62,000.00 Total Costs $ 768,000.00 $ 775,000.00 Lakeview Geothermal Power Generation Facility Feasibility Study 16

PDF Image | LAKEVIEW GEOTHERMAL POWER GENERATION FACILITY FEASIBILITY

lakeview-geothermal-power-generation-facility-feasibility-019

PDF Search Title:

LAKEVIEW GEOTHERMAL POWER GENERATION FACILITY FEASIBILITY

Original File Name Searched:

LakeviewGeothermal.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP