LAKEVIEW GEOTHERMAL POWER GENERATION FACILITY FEASIBILITY

PDF Publication Title:

LAKEVIEW GEOTHERMAL POWER GENERATION FACILITY FEASIBILITY ( lakeview-geothermal-power-generation-facility-feasibility )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 024

Permitting A self certified status or a qualifying facility permit is required from the Federal Energy Regulatory Commission. The form for self certifying is included in the Appendix. A Small Power Production Facility is a generating facility whose primary energy source is renewable (hydro, wind, solar, etc.), biomass, waste, or geothermal resources, and that otherwise meets the requirements of 18 C.F.R. §§ 292.203(a), 292.203(c) and 292.204. Small power production facilities are limited in size to 80 MW, with the exception of certain types of facilities certified prior to 1995 and designated as "eligible" under section 3(17)(E) of the Federal Power Act. An owner or operator of a generating facility may obtain QF (Qualifying Facility) status by either submitting a self-certification or applying for and obtaining a Commission certification of QF status. The choice of whether to certify a facility through a self- certification or Commission certification is up to the applicant. In some instances, negotiations with a lender or utility purchaser may proceed more smoothly if the facility has been certified by the Commission. A completed Form No. 556 must be submitted with each self-certification or application for Commission certification of QF status. A self-certification of QF status under 18 C.F.R. § 292.207(a) must include the following: • A cover letter that announces the self-certification of QF status of the applicant's facility and references the enclosures (Form No. 556; draft Federal Register notice, as applicable). If a docket number already exists for your facility, you should clearly identify it in the cover letter. • Original and 14 copies of a completed Form No. 556. There is no fee for filing a self-certification. Self certification is the recommended option for the town. Complete filing instructions are available on the Federal Energy Regulatory Agencies website. Permits will also be required from the Oregon Water Resources Department for additional water use on the Town’s cold water well, and the Utley Well. The cold water well will need an additional water right of 300 gpm with the Utley Well also requiring 300 gpm. The re-injection well for cold water needs to be a part of the cold water application as they work together to result in a smaller net water use. Filing the Water Resources permit applications is straight forward with an estimated cost of $2,500. These applications should be submitted soon due to the Water Resources Department work loads. Lakeview Geothermal Power Generation Facility Feasibility Study 21

PDF Image | LAKEVIEW GEOTHERMAL POWER GENERATION FACILITY FEASIBILITY

PDF Search Title:

LAKEVIEW GEOTHERMAL POWER GENERATION FACILITY FEASIBILITY

Original File Name Searched:

LakeviewGeothermal.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)