logo

U.S. Geothermal Power Production and Development

PDF Publication Title:

U.S. Geothermal Power Production and Development ( us-geothermal-power-production-and-development )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 006

 Wildhorse-North Geysers – 30 MW – Calpine Corporation  Black Rock 1 – 53 MW – CalEnergy  Black Rock 2 – 53 MW – CalEnergy  Black Rock 3 – 53 MW – CalEnergy Phase 4  The Geysers Field/ WGP Unit 1 Geothermal Project – 35 MW – Western GeoPower Corp.  Hudson Ranch I – 49.9 MW – CHAR, LLC Unconfirmed  Salton Sea – 18 – 38 MW – Sierra Geothermal Power 2.4. Colorado: 10 MW Phase 2  Mount Princeton Hot Springs* – 10 MW – Mt. Princeton Geothermal 2.5. Florida: 0.2 MW – 1 MW Phase 1  Jay Oil Field – 200 kW (Potential for 1 MW) – Chena Hot Springs, Quantum Resources Management, UTC Power 2.6. Hawaii: 8 MW Phase 1  Unspecified Hawaii Project – Unspecified – Ormat Technologies, Inc. Phase 3  Puna – 8 MW – Ormat Technologies, Inc. Unconfirmed  Maui – Unspecified – Ormat Technologies, Inc. 2.7. Idaho: 238 – 326 MW Phase 1 Phase 2  Willow Springs* – 100 MW – Idatherm, LLC Phase 3  Raft River Expansion – 13 – 26 MW – U.S. Geothermal 2.8. Nevada: 1767.4 – 3297.4 MW Phase 1  Sulphur Springs* – 25 – 50 MW – Idatherm, LLC  Preston Area Project* – 50 MW – Idatherm, LLC  China Cap* – 50 – 100 MW – Idatherm, LLC  Nellis Air Force Base – 5 – 30 MW – Navy Geothermal Program Office  Gerlach – 7 – 15 MW – Sierra Geothermal Power  Howard – 8 – 17 MW – Sierra Geothermal Power  Spencer – 9 – 19 MW – Sierra Geothermal Power  Hawthorne – 10 – 22 MW – Sierra Geothermal Power  Hawthorne Army Ammunition Depot 2 – 10 – 30 MW – Navy Geothermal Program Office  Naval Air Station, Fallon – 10 – 30 MW – Navy Geothermal Program Office  Hawthorne Army Ammunition Depot – 12 – 25 MW – Navy Geothermal Program Office 6

PDF Image | U.S. Geothermal Power Production and Development

us-geothermal-power-production-and-development-006

PDF Search Title:

U.S. Geothermal Power Production and Development

Original File Name Searched:

Industry_Update_March_Final.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP