Organisations in Different Renewables

PDF Publication Title:

Organisations in Different Renewables ( organisations-different-renewables )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 061

• identification of the main heavy metal pollution sources arising from the historical and ongoing mining activities in the catchment; • estimates of the amounts of heavy metals that would enter a proposed storage; • modelling of the heavy metals within a proposed storage; • the status of the biota in the river systems and assessment of the effect of heavy metals on the biota; and • proposed methods of reducing pollution off the lease site to acceptable levels. Based on these studies, the dam and power station are located upstream of the Queen River tributary that delivers tailings to the lower King River, but acid drainage off the lease site into the proposed storage would occur. Diversion works were undertaken on the lease site to address this occurrence, and are described in Section 6. Although in 1983 Hydro Tasmania was not required to prepare environmental impact statements, the business voluntarily prepared an Environmental Management Plan for the construction of the King scheme. This was the first hydro-power scheme built in Australia to have a formal Environmental Management Plan, and this plan influenced the design and construction activities for the development. An Environmental Committee was formed for the construction period to ensure that unnecessary impacts were avoided and unavoidable ones were minimised and treated. The power scheme is located very close to the Tasmanian Wilderness World Heritage Area. In recognition of this, great care was taken to minimise visual damage to the landscape. Measures in the Environmental Management Plan to minimise visual impact included: • siting temporary access tracks, camps, works areas and quarries for rockfill below minimum water levels so they would not be visible after commissioning; • placing excess road spoil and material from other engineering works below minimum water levels; • locating permanent roads and structures as unobtrusively as possible including: − reducing the size of roadside excavations (batters); − more closely spacing horizontal steps in the batters to allow greater coverage by vegetation; − having a single lane road (rather than two lanes); and − lowering the design speed of the road; • stockpiling of peat and topsoil removed in the constructio n process for reuse during restoration and revegetation of road cuttings, spoil dumps and disturbed areas; • using native species for revegetation; • developing hydro-mulching strategies effective in the local environment for the revegetation of rocky or steep areas; • salvaging timber from the storage area before commissioning to avoid unsightly dead trees and hazards for boats using the lake; and • using materials for and siting the transmission line to make it as visually unobtrusive as possible. Further environmental issues addressed in the Environmental Management Plan included:

PDF Image | Organisations in Different Renewables

PDF Search Title:

Organisations in Different Renewables

Original File Name Searched:

PUB_Renewable_Energy_Projects_Handbook_2004_Annexes_WEC.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)