COMPREHENSIVE RENEWABLE ENERGY FEASIBILITY STUDY Sitka

PDF Publication Title:

COMPREHENSIVE RENEWABLE ENERGY FEASIBILITY STUDY Sitka ( comprehensive-renewable-energy-feasibility-study-sitka )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 032

http://www1.eere.energy.gov/geothermal/current_solicitations.html Renewable Energy Fund: Renewable Energy Grant Program (AEA) The Alaska legislature has already authorized a $100 million fund for renewable energy projects. For more information follow the link: www.akenergyauthority.org/RE_Fund.html Renewable Energy Production Tax Credit (PTC) A corporate tax break that reduces the final energy costs to supply output to the market. Currently the PTC for geothermal is $.021 per kWh. For more information follow the link: www.irs.gov/pub/irs‐ pdf/f8835.pdf Cap & Trade System (pollution credits) Future benefits could exist if a cap and Trade system is implemented. Cap and Trade is a policy approach for controlling major ground source emission sources. The system’s goals include: 1) capping emissions 2) providing accountability 3) and simplicity of design and operation. For more details please follow the link: http://www.epa.gov/airmarkets/cap‐trade/docs/ctessentials.pdf Database for State Incentives for Energy and Incentives (DSIRE) A general overview of state and federal funding and financing opportunities currently available for geothermal energy. For more information follow the link: www.dsireusa.org/ Regulation & Authorities Alaska statutes govern the sale and disposal of state‐owned mineral interest. AS 38.05.035(e) essentially states that if the use of the land best suites the states interest and the ADNR commissioner approves the contracts for sale, lease, or disposal of available land, resources, property, or interests in them. This is known as a Best Interest Finding (BIF) and describes and analyzes the potential effects of the transaction and ways to mitigate those effects. Geothermal Land Leases All geothermal leases, whether awarded competitively or noncompetitively, are for a primary term of 10 years. Geothermal lease renewal and extension requirements are set out at 11 AAC 84.745(a), which says: “If, at the expiration of the 10‐year primary term of a geothermal lease, the lessee has begun operations necessary to drill a geothermal well using equipment located at the lease area of sufficient size and capacity to drill to the total depth proposed in the plan of exploration for the well, the commissioner will, in his discretion, extend the geothermal lease for one five‐year term. In this subsection, “operations necessary to drill a geothermal well” includes drilling, re‐drilling, sidetracking, or other techniques necessary to reach the bottom hole location proposed in the plan of exploration.” (DOG, 2008) Alaska Department of Natural Resources (ADNR) The ADNR commissioner is needed for approval of land contracts. Alaska Division of Lands (ADL)

PDF Image | COMPREHENSIVE RENEWABLE ENERGY FEASIBILITY STUDY Sitka

PDF Search Title:

COMPREHENSIVE RENEWABLE ENERGY FEASIBILITY STUDY Sitka

Original File Name Searched:

Traviss_Study.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)