logo

COMPREHENSIVE RENEWABLE ENERGY FEASIBILITY STUDY Sitka

PDF Publication Title:

COMPREHENSIVE RENEWABLE ENERGY FEASIBILITY STUDY Sitka ( comprehensive-renewable-energy-feasibility-study-sitka )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 085

• Type of project: expansion of an existing project will entail less exploration cost than a greenfield project (one that hasn’t been previously drilled), where specific resource locations are unknown • Plant size: the larger the plant, the less the cost per megawatt (economies of scale) • Well characteristics: depth, diameter, productivity, subsurface geology, rock formation properties • Site location and accessibility both influence exploration costs; costs tend to increase if the resource is located in a remote area • Exploration techniques, including geophysics, chemistry, and number of slim holes needed • Time delays • Ease with which the resource can be retrieved, influenced by permeability, depth of the reservoir, and pressure • Characteristics of the geothermal fluid/steam, including chemistry and temperature • Fluctuations in the costs of certain materials or services, such as drilling, cementing, or steel for well casing • Lease costs and lag time in obtaining leases and permits increase the costs associated with exploration • Competition for drill rigs, as has occurred in Nevada over the past year as both gold and geothermal exploration have expanded • Transmission costs • Tax incentives, such as the production tax credit (PTC) included in the 2005 Energy Policy Act (EPAct) • Financing: types of investors, interest rates, debt periods, rate of return • Resource availability and quality • Seasonal and weather variability Appendix GEA, 2009

PDF Image | COMPREHENSIVE RENEWABLE ENERGY FEASIBILITY STUDY Sitka

comprehensive-renewable-energy-feasibility-study-sitka-085

PDF Search Title:

COMPREHENSIVE RENEWABLE ENERGY FEASIBILITY STUDY Sitka

Original File Name Searched:

Traviss_Study.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP