logo

Current Costs of Geothermal Power Generation in New Zealand

PDF Publication Title:

Current Costs of Geothermal Power Generation in New Zealand ( current-costs-geothermal-power-generation-new-zealand )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 014

Assessment of the Costs of Geothermal Power Generation in New Zealand 3. Components of a Geothermal Development The key components of a geothermal power project (GPP) are: the geothermal field or resource and the wells that tap it; the fluid collection and disposal system that take geothermal fluids from the wells, conditions them, delivers them to the power plant, and takes the waste fluids for disposal; the power plant (within the power plant fence); and the electricity transmission system (to deliver power to the interconnection point). The capital cost of a GPP is affected by factors such as the size of the project, the energy conversion process used, the size and number of individual generating units, and the character of the geothermal field (Mills, 2002). Since, to a significant extent, the character of the field affects the size and type of power plant, the capital cost of a GPP is greatly affected by the resource conditions. However, there is latitude for choice irrespective of the resource conditions, and these are matters for the developer to decide. The electricity tariff dictates the range of generation technologies which it is feasible to apply. For example, elsewhere in the world the use of lower temperature resources and pumped wells is the norm, but at current and reasonably foreseeable prices in New Zealand this is probably not competitive in the medium term and has not been considered as an option. Geothermal development costs are conventionally assessed on a greenfield basis – i.e. they take into account all costs incurred from initial surface exploration, exploration and development drilling, through to steamfield and power plant development, construction and commissioning. The New Zealand geothermal industry is somewhat unusual in that the Crown (the Government) has had an extensive historical involvement in resource exploration and proving and this has served to reduce development costs in New Zealand relative to true greenfield developments elsewhere. All of the recent geothermal developments in New Zealand have, to at least some extent, availed of this Crown legacy - Mokai, Poihipi, Rotokawa and Ngawha and the current development at Kawerau. Additionally, there are still unused productive Crown wells at Ngawha, Ngatamariki, Rotokawa and Tauhara. 3.1 The Geothermal Resource The character of a geothermal resource / field is dictated by the following fundamental factors: a) the area of the field (km2) b) the degree of recharge c) the power potential of the field (MW) (i.e. energy reserves or field capacity) Sinclair Knight Merz SKM Cost of Geothermal Power Report (2007 Cost Basis)R1.doc PAGE 6

PDF Image | Current Costs of Geothermal Power Generation in New Zealand

current-costs-geothermal-power-generation-new-zealand-014

PDF Search Title:

Current Costs of Geothermal Power Generation in New Zealand

Original File Name Searched:

SKM_Cost_of_Geothermal_Power_Report_2007_Cost_Basis_R1.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP