Current Costs of Geothermal Power Generation in New Zealand

PDF Publication Title:

Current Costs of Geothermal Power Generation in New Zealand ( current-costs-geothermal-power-generation-new-zealand )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 033

Assessment of the Costs of Geothermal Power Generation in New Zealand 6. Cost Assumptions The following cost assumptions have been made in building up an overall definition of geothermal capital and operating costs for the development scenarios detailed in the previous chapter. 6.1 Establishment Costs A total of NZD 3.0 million has been allowed for establishment costs associated with a 20 MW development, and NZD 3.5 million for a 50 MW development. These costs include: Permitting Land acquisition Geoscientific / Environmental Well Testing Civil works and Infrastructure Site Operations, and Pre Feasibility/ Feasibility Reports. 6.2 DrillingCosts Well drilling costs can vary significantly depending on the depth and size of wells to be drilled, the capability of the rig, the number of holes to be drilled (which allows rig mobilisation cost to be shared over a number of wells), topography and site access generally, and the drilling conditions encountered. Well costs as given in Table 6-1 are assumed. Given the level of these costs the drilling of wells with large well outputs is clearly advantageous to project economics. The high level of drilling costs also emphasises the importance of achieving the highest possible drilling success rate throughout exploration, delineation and production drilling programs. The need for thorough geoscientific work at the pre- drilling phase and throughout later drilling is thus evident. This can be highly cost effective because of the low cost of scientific work compared to the high cost of drilling. It is important to note that well drilling costs have increased considerably over the last few years and upward movement in the cost of drilling rigs and drilling equipment continues. This is discussed in more detail in Section 7.3. Sinclair Knight Merz SKM Cost of Geothermal Power Report (2007 Cost Basis)R1.doc PAGE 25

PDF Image | Current Costs of Geothermal Power Generation in New Zealand

PDF Search Title:

Current Costs of Geothermal Power Generation in New Zealand

Original File Name Searched:

SKM_Cost_of_Geothermal_Power_Report_2007_Cost_Basis_R1.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)