Text from PDF Page: 035

Assessment of the Costs of Geothermal Power Generation in New Zealand 6.3 Steamfield Costs Steamfield development costs have been assessed using a bottom-up approach based on the following considerations: Steamfield piping This includes two phase piping, separators, steam and brine piping and reinjection pumps to take geothermal fluid from the production wells to the power plant, and dispose of waste fluids to reinjection wells. The numbers of wells required and mass flow rates are as detailed in Table 5-1 and Table 5-2 for each of the “high well flow” and “low well flow” development scenario. These dictate piping sizes. The required piping lengths have been obtained from the steamfield concept layout in Figure 5-1. Based on this information, a piping schedule has been drawn up and costed. Approximately 30% of the total piping cost is allocated to piping materials procurement in foreign currency and the balance of 70% is for pipeline erection allocated in NZD. Steamfield plant These items include line valves and instrumentation, and steam / water production separators and brine pumps for either 20 or 50 MW size depending on development options. Estimated foreign currency cost allocations for these are 100%, 50% and 80% respectively. Site Civil Works This requirement includes preparation of site roading, separator station foundations, well pads and multi well cellars. These costs are allocated 100% to local currency. Within the precision of this study, the steamfield development requirements are assumed to be the same for the single flash, hybrid steam + binary and the pure ORC options, as they involve the same piping layout and control systems and a single separation in each case. The double flash option is more complex, involving a greater cost due to the requirement for a second flash vessel / separator, more piping around the separator station, further instrumentation and additional civil works. Estimated steamfield development costs for the various options are given in Table 6.2. These capital costs are carried forward into Section 7 where they are used to build up a total capital cost for each of the 32 project development scenarios. The overall balance of New Zealand costs to overseas costs is estimated at about 80% for both the 20 and 50 MW plants. Sinclair Knight Merz SKM Cost of Geothermal Power Report (2007 Cost Basis)R1.doc PAGE 27

PDF Image | Current Costs of Geothermal Power Generation in New Zealand

current-costs-geothermal-power-generation-new-zealand-035

PDF Search Title:

Current Costs of Geothermal Power Generation in New Zealand

Original File Name Searched:

SKM_Cost_of_Geothermal_Power_Report_2007_Cost_Basis_R1.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP