Current Costs of Geothermal Power Generation in New Zealand

PDF Publication Title:

Current Costs of Geothermal Power Generation in New Zealand ( current-costs-geothermal-power-generation-new-zealand )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 043

Assessment of the Costs of Geothermal Power Generation in New Zealand 6.6.3 Total O&M Costs Combining O&M costs from the three sections above gives the following overall O&M costs from which it can be seen to range from 1.5 to 2.0 NZ cent.kWh-1 for 50 and 20 MW developments respectively. Table 6-8 Total Geothermal Project O&M Costs In addition to these fixed and variable costs there are additional planned maintenance costs associated with regular major overhauls which include statutory inspections. These costs are estimated at 150,000 NZD per overhaul for a 20 MW plant and 200,000 NZD for a 50 MW plant. The frequency of such inspections varies from one plant to another but is generally once every three years. A final cost category related to stocks and costs of consumables has been allowed for at 10% of total O&M costs. 6.7 Commercial Costs Commercial costs associated with developments also need to be included in costing a geothermal project. These include financing charges (including establishment costs and interest), interest during construction, corporate overhead, legal costs, insurances, and the like. Due allowance needs to be made for these in the financial analysis. These costs are discussed in more detail in Section 8. 6.8 Cost Sensitivities 6.8.1 Sensitivity to Drilling Success Drilling success is of considerable importance to project development costs and overall economics. If the resource is well understood, and conditions are favourable, drilling success rates of 70% or more may be achieved (including exploration wells), resulting in lower total drilling costs for a given size of project. In the New Zealand geothermal environment, success rates by private sector developers are generally higher than this due to the considerable Crown legacy in exploration drilling and resource proving which removes much of the well success risk on the private sector (see Section 4 for further discussion on this). For the purposes of this study, the low and high envelope well Sinclair Knight Merz Steam field O&M NZD.yr‐1 $ 600,000 $ 1,600,000 20 MW plant NZD.kWh ‐1 $ 0.004 $ 0.010 NZD.kWe ‐1 $ 30 $ 80 NZD.yr‐1 $ 1,500,000 $ 2,400,000 50 MW Plant NZD.kWh ‐1 $ 0.004 $ 0.006 NZD.kWe ‐1 $ 30 Power Plant O&M TOTALS $ 2,200,000 $ 0.014 $ 110 $ 3,900,000 $ 0.010 $ 50 $ 80 SKM Cost of Geothermal Power Report (2007 Cost Basis)R1.doc PAGE 35

PDF Image | Current Costs of Geothermal Power Generation in New Zealand

PDF Search Title:

Current Costs of Geothermal Power Generation in New Zealand

Original File Name Searched:

SKM_Cost_of_Geothermal_Power_Report_2007_Cost_Basis_R1.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)