Current Costs of Geothermal Power Generation in New Zealand

PDF Publication Title:

Current Costs of Geothermal Power Generation in New Zealand ( current-costs-geothermal-power-generation-new-zealand )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 057

Assessment of the Costs of Geothermal Power Generation in New Zealand 2006, whereas in 2007 the rate for a large 3500 m capacity drilling rig with one million pound hook load capacity was around NZD 55,000 per day The drilling costs estimated in Section 6.3 were best estimates at current 2007 costs but it needs to be noted that these would need to be updated if cost reliance was required. Such impacts of fossil fuel price increases are negative for geothermal energy, but of more significance is the effective raising of the cost of gas with its direct impact on wholesale electricity price. Increases in drilling costs could be more than offset by increased wholesale electricity prices which would tend to stimulate geothermal power generation development. 7.4.2 Impact of increase in commodity prices22 The pace of infrastructure developments in China over recent years has led to a huge increase in prices of metal commodities. Metals of direct relevance to the power industry are shown in Figure 7.5 and these increased fourfold between 2003 and 2007. SKM is aware of the following impacts of the current global economic conditions on power generation projects in Australasia: In the transmission sector: – between 2003 and 2007 transmission line costs went up by 18 % compared with CPI of 11% – power transformer costs went up by 20% between 2005 and 2007 due to substantial increases in core steel prices for the NZ market, and international freight costs In the generation sector, during 2006 alone: – there was a 3 to 6% increase in the cost of gas turbines – a 6 to 12% increase steam turbines and generator costs, and – a 5% increase for balance of plant – Based on material price influence for turbine, generator and balance of plant, overall plant investment costs are increasing by more than 5% pa, comparedwithCPIaround3% In the Australian construction sector, which the New Zealand sector follows, actual costs between 2003 and 2007 increased at a rate 3 times that predicted by CPI. Regulators favour the use of CPI as an escalation index in that it is simple, recognized and readily audited. However experience in 2003 to 2006 cited here suggested that: CPI is not a reliable indicator of future costs, and Volatility in commodity prices is resulting in significant % increases. Sinclair Knight Merz SKM Cost of Geothermal Power Report (2007 Cost Basis)R1.doc PAGE 49

PDF Image | Current Costs of Geothermal Power Generation in New Zealand

current-costs-geothermal-power-generation-new-zealand-057

PDF Search Title:

Current Costs of Geothermal Power Generation in New Zealand

Original File Name Searched:

SKM_Cost_of_Geothermal_Power_Report_2007_Cost_Basis_R1.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP