Optimizing Heat Recovery Systems for Power Generation in Rural AK

PDF Publication Title:

Optimizing Heat Recovery Systems for Power Generation in Rural AK ( optimizing-heat-recovery-systems-power-generation-rural-ak )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 028

Chapter 6 Commissioning The commission started on December 12, 2012 and lasted for about a week. Before commissioning, the ORC system (the Green Machine or GM) user needs to install heat source, heat sink, electrical circuit, and a dedicated internet line (as mentioned in the previous chapters) to the GM based on the requirement list provided by the manufacturer of GM, ElectraTherm (ET). The completed GM Installation Requirement list and a Pre- Commissioning Check list need to be received by ET before any engineer can be dispatched for commissioning. During the commissioning, the ET commissioning engineer performed the following:  Checked the installation of the supporting systems: This included investigation of all the installed heating, cooling, and electrical systems and the internet connection. There were many discussions between the ET engineer and the UAF engineers.  Checked the Green Machine: A double check of the information and locations of the labels, installations and functionalities of the components, match of the specification received by the customer and the specification of the manufacturer’s record, etc.  Working fluid transferring: Conducted pressure test and transferred working fluid from storage bottles into GM. Details could be found in Chapter 5 (Fluid Transferring) of the GM manual.  Parameter setup: Set up start parameters, operation parameters, default parameters, and other parameters using HMI. Details could be found in Chapter 7 (Set Up) of the GM manual.  Starting up of the GM: Tested of emergency stop, operation mode, alarm mode, and PLC-IO, etc. Details could be found in Section 3.4 of the (Operation) and Chapter 7 (Distributor Manual) of the GM manual.  Training: A comprehensive training was held for the ACEP engineers involved in this project. The training includes the most important materials covered in the GM manual, which include: information of installation, routine maintenance and special tools, operation, background, fluid transferring, tasks and applications of HMI. This part training is for general audience (many of the ACEP engineers, students, faculty and staff members).  Hands on system set up and operation training: This training is for an engineer and a graduate student who would perform the GM test.  In addition, some design issues have been discussed. Two important examples are listed below: 1. All the components of GM have been designed for the capacity of 65kW, but the system was rated as a 50kW system. This down grade was due to the lack of an emergency by pass valve to prevent the screw expander from over speeding while the engine is shutting-off. This unit can be modified with a retrofit to make it operate at 65kW safely. 2. To start the GM, the temperature of the heating fluid entering into the GM cannot be too high. Otherwise, the screw expander will be over speed and the 28

PDF Image | Optimizing Heat Recovery Systems for Power Generation in Rural AK

PDF Search Title:

Optimizing Heat Recovery Systems for Power Generation in Rural AK

Original File Name Searched:

TCC_Final_Project_Report.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)