logo

STATE OF THE TRIBAL LANDS FOR GEOTHERMAL RESOURCES

PDF Publication Title:

STATE OF THE TRIBAL LANDS FOR GEOTHERMAL RESOURCES ( state-oftribal-lands-for-geothermal-resources )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 104

Appendix D. Best Management Practices – Mitigation Measures D-14 impacts or mitigation of effects. The BLM will make determinations of eligibility and effect and consult with SHPO as necessary based on each proposed lease application and project plans. The BLM may require modification to exploration or development proposals to protect such properties, or disapprove any activity that is likely to result in adverse effects that cannot be successfully avoided, minimized or mitigated. Avoidance of impacts through project design will be given priority over data recovery as the preferred mitigation measure. Avoidance measures include moving project elements away from site locations or to areas of previous impacts, restricting travel to existing roads, and maintaining barriers and signs in areas of cultural sensitivity. Any data recovery will be preceded by approval of a detailed research design, Native American Consultation, and other requirements for BLM issuance of a permit under the Archaeological Resources Protection Act (BLM 2007a). x If cultural resources are present at the site, or if areas with a high potential to contain cultural material have been identified, a cultural resources management plan (CRMP) shall be developed. This plan shall address mitigation activities to be taken for cultural resources found at the site. Avoidance of the area is always the preferred mitigation option. Other mitigation options include archaeological survey and excavation (as warranted) and monitoring. If an area exhibits a high potential, but no artifacts were observed during an archaeological survey, monitoring by a qualified archaeologist could be required during all excavation and earthmoving in the high- potential area. A report shall be prepared documenting these activities. The CRMP also shall (1) establish a monitoring program, (2) identify measures to prevent potential looting/vandalism or erosion impacts, and (3) address the education of workers and the public to make them aware of the consequences of unauthorized collection of artifacts and destruction of property on public land (BLM 2005). National Scenic and Historic Trails When any ROW application includes remnants of a National Historic Trail, is located within the viewshed of a National Historic Trail’s designated centerline, or includes or is within the viewshed of a trail eligible for listing on the NRHP, the operator shall evaluate the potential visual impacts to the trail associated with the proposed project and identify appropriate mitigation measures for inclusion as stipulations in the operation plan. Visual Resources x The BLM will consider the visual resource values of the public lands involved in proposed projects, consistent with BLM Visual Resource Management (VRM) policies and guidance. Draft PEIS for Geothermal Leasing in the Western US May 2008

PDF Image | STATE OF THE TRIBAL LANDS FOR GEOTHERMAL RESOURCES

state-oftribal-lands-for-geothermal-resources-104

PDF Search Title:

STATE OF THE TRIBAL LANDS FOR GEOTHERMAL RESOURCES

Original File Name Searched:

vol3_p1.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP