logo

Washington Geothermal Energy Status

PDF Publication Title:

Washington Geothermal Energy Status ( washington-geothermal-energy-status )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 010

Electrical Power Generation and Capacity for Washington Washington has had minimal exploration of its geothermal power production potential. Therefore, projected geothermal electrical output is best classified as educated estimates. In addition to information provided in the programmatic environmental impact statement (PEIS) discussed below, the Western Governors’ Association’s Clean and Diversified 16 estimates five sites producing a near- term projection of 50 MW (page 6), with long-term projections of 600 MW for sites at Mount Baker and Wind River (Gifford Pinchot National Forest) in the Cascade Range (page 64). The U.S. Geological Survey (USGS) report Assessment of Moderate- and 17 Energy Initiative, Geothermal Task Force Report High-Temperature Geothermal Resources of the United States estimates a mean probability of electrical power generation for identified geothermal resources on all lands in Washington during the next 30 years at 23 MW, with a total low-high range of 7 MW to 47 MW (page 4). Most but not all of the suspected geothermal power generation potential in Washington is found on U.S. Forest Service lands (Mount Baker and Gifford Pinchot National Forests). Both national forests had geothermal exploration leases in the 1970s and early 1980s. Federal Law The federal Public Law 109-58, Energy Policy Act of 2005, section 225, Coordination of Geothermal Leasing on Federal Lands, includes the following language: (a) IN GENERAL.—Not later than 180 days after the date of enactment of this section, the Secretary of the Interior and the Secretary of Agriculture shall enter into and submit to Congress a memorandum of understanding in accordance with this section, the Geothermal Steam Act of 1970 (as amended by this Act), and other applicable laws, regarding coordination of leasing and permitting for geothermal development of public lands and National Forest System lands under their respective jurisdictions. (b) LEASE AND PERMIT APPLICATIONS.—The memorandum of understanding shall— (1) establish an administrative procedure for processing geothermal lease applications, including lines of authority, steps in application processing, and time limits for application procession; (2) establish a 5-year program for geothermal leasing of lands in the National Forest System, and a process for updating that program every 5 years; and (3) establish a program for reducing the backlog of geothermal lease application pending on January 1, 2005, by 90 percent within the 5-year period beginning on the date of 16 17 www.westgov.org/wga/initiatives/cdeac/Geothermal-full.pdf pubs.usgs.gov/fs/2008/3082/pdf/fs2008-3082.pdf 6

PDF Image | Washington Geothermal Energy Status

washington-geothermal-energy-status-010

PDF Search Title:

Washington Geothermal Energy Status

Original File Name Searched:

WashingtonGeothermalEnergyStatusAndRoadmap.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP