logo

Unlocking Geothermal Power Eastern Caribbean Powerhouse

PDF Publication Title:

Unlocking Geothermal Power Eastern Caribbean Powerhouse ( unlocking-geothermal-power-eastern-caribbean-powerhouse )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 132

Neither GRENLEC nor the government has published cost estimates for developing a 10 MW geothermal plant. Cost estimates vary significantly, which reflects the uncertainty about the quality of Grenada’s geothermal resource. Preliminary estimates suggest that a 10 MW geothermal power plant on Grenada could cost about US$87 million.302 This estimate includes all stages, from surface exploration to production drilling and construction of the power plant. The cost of construction of the power plant is US$45 million. The construction of transmission lines and access roads would increase the total cost to about US$102 million. West Japan Engineering Consultants, Inc. estimated the cost of building a prototype 20 MW power plant to be US$40 million. Their cost estimate increases to US$125 million when costs for production drilling, physical contingency, and consultant fees and administrative expenses are included.303 The government would need to determine the size and quality of the geothermal resource to accurately estimate the costs of the project. 302. Financial model that accompanies this report, based on information from: Magnus Gehringer and Victor Loksha, Geothermal Handbook: Planning and Financing Power Generation (Washington, DC: The International Bank for Reconstruction and Development, Technical Report 002/12, June 2012), accessed October 22, 2014, http://www.esmap.org/sites/esmap.org/files/DocumentLibrary/FINAL_ Geothermal%20Handbook_TR002-12_Reduced.pdf; IDB, “Sustainable Energy Facility (SEF) for the Eastern Caribbean: Loan Proposal RG-L1071, RG-G1009, and RG-G1004” (2015), accessed December 2, 2015, http://www.iadb.org/en/projects/project-description-title,1303. html?id=RG-L1071. 303. West Japan Engineering Consultants, Inc., “Study on Current Status of Geothermal Development in the Eastern Caribbean Islands: Field Trip Report and Study Tour in Costa Rica,” March 2014. 131

PDF Image | Unlocking Geothermal Power Eastern Caribbean Powerhouse

unlocking-geothermal-power-eastern-caribbean-powerhouse-132

PDF Search Title:

Unlocking Geothermal Power Eastern Caribbean Powerhouse

Original File Name Searched:

Eastern-Caribbean-Geothermal-Powerhouse.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP