Unlocking Geothermal Power Eastern Caribbean Powerhouse

PDF Publication Title:

Unlocking Geothermal Power Eastern Caribbean Powerhouse ( unlocking-geothermal-power-eastern-caribbean-powerhouse )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 147

Below we provide a more in-depth description of the bodies with major responsibilities in the electricity sector. • Policymaking—There are two ministries responsible for developing policies in the energy sector. - The Ministry of Finance is responsible for developing sustainable energy policies.328 - TheNevisMinistryofCommunications and Works, Public Utilities, Posts, Physical Planning, Natural Resources, and Environment (“the Nevis Ministry of Natural Resources”) is responsible for developing environmental policies and overseeing the use of natural resources.329 The Geothermal Resource Advisory Committee, headed by the minister responsible for natural resources, coordinates and implements renewable energy policies related to geothermal resources.330 • Regulation—The PUC Act mandates that the PUC be established as an independent regulator. However, the PUC has not been appointed. Instead, the Ministry of Housing carries out some regulatory functions. The Ministry of Housing is responsible for overseeing NEVLEC and has the power at the national level to grant and revoke electricity licenses to generate, transmit, and distribute electricity.331 • Generation, Transmission, and Distribution— NEVLEC, a wholly state-owned enterprise, holds the exclusive license to transmit and distribute electricity. This license does not have an expiration date. IPPs can operate in Nevis, but they must sell their electricity to NEVLEC.332 Currently one IPP operates in Nevis, which produces wind power.333 The Saint Kitts Electricity Company Limited (SKELEC), a vertically integrated state-owned electricity utility, holds an exclusive license to provide electricity in Saint Kitts. Saint Kitts has coverage of 95 percent.334 In 2015, SKELEC owned 43 MW of generation capacity, and had a peak demand of 24 MW.335 The Electricity Supply Act of 2011 establishes the structure of and regulates the electricity sector in Saint Kitts. There is no independent regulator. The Ministry of Housing is responsible for the oversight of public utilities at the national level. The Ministry of Finance is responsible for developing energy policies that apply to the Federation.336 The government has drafted, but not approved, a Draft National Energy Policy and a Draft National Energy Action Plan. These documents outline the government’s objectives of increasing the use of renewable energy and improving the efficiency of electric utilities in the Federation. 14.2 Overview of the Electricity Sector in Saint Kitts 328. Ibid. 329. Nevis Island Administration, “Physical Planning: About,” February 19, 2014, accessed October 31, 2014, http://www.nia.gov.kn/index. php/ministries/communications/physical-planning. 330. National Renewable Energy Laboratory and Organization of American States, “Energy Policy and Sector Analysis in the Caribbean 2010–2011,” accessed October 31, 2014, http://www.ecpamericas.org/data/files/Initiatives/lccc_caribbean/LCCC_Report_Final_ May2012.pdf. 331. Herbert Samuel, “A Review of the Status of the Interconnection of Distributed Renewables to the Grid in CARICOM Countries” (October 2013), accessed November 17, 2014, http://www.credp.org/Data/CREDP-GIZ_Interconnection_Report_Final_Oct_2013.pdf. 332. National Renewable Energy Laboratory and Organization of American States, “Energy Policy and Sector Analysis in the Caribbean 2010–2011,” accessed October 31, 2014, http://www.ecpamericas.org/data/files/Initiatives/lccc_caribbean/LCCC_Report_Final_ May2012.pdf. 333. Herbert Samuel, “A Review of the Status of the Interconnection of Distributed Renewables to the Grid in CARICOM Countries” (October 2013), accessed November 17, 2014, http://www.credp.org/Data/CREDP-GIZ_Interconnection_Report_Final_Oct_2013.pdf. 334. REEGLE, “Policy and Regulatory Overviews: Saint Kitts and Nevis (2012),” accessed November 5, 2014, http://www.reegle.info/policy- and-regulatory-overviews/KN. 335. National Renewable Energy Laboratory, “Energy Snapshot: The Federation of Saint Christopher and Nevis,” Energy Transition Initiative, Islands (March 2015, DOE/GO-102015-4581), accessed August 5, 2015, http://www.nrel.gov/docs/fy15osti/62706.pdf. 336. Herbert Samuel, “A Review of the Status of the Interconnection of Distributed Renewables to the Grid in CARICOM Countries” (October 2013), accessed November 17, 2014, http://www.credp.org/Data/CREDP-GIZ_Interconnection_Report_Final_Oct_2013.pdf. 146

PDF Image | Unlocking Geothermal Power Eastern Caribbean Powerhouse

unlocking-geothermal-power-eastern-caribbean-powerhouse-147

PDF Search Title:

Unlocking Geothermal Power Eastern Caribbean Powerhouse

Original File Name Searched:

Eastern-Caribbean-Geothermal-Powerhouse.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP