14.4.2 Key risks and mitigation measures for Phase 1 Table 14.1 shows that the project has few major risks. The geothermal resource in Nevis is proven, so the major risks that the project faces are all related to production well drilling and project development. Table 14.1 Market, Demand, or Volume RiskPotential Resource Risk Construction Risk Technical Risk Operating Risk Political and Social Risk Environmental Risk Financing Risk Regulatory Risk Allocation of Risks for the Proposed PPP Structure A PPA and a payment support mechanism for NEVLEC’s payments under the PPA Low. The risk is low because slim-hole drilling has been completed and the estimated resource potential is high. The SPV can hire a company to build the plant and incorporate penalties if the plant is not completed on time or milestones are not achieved as contractually planned. None. The risk is low because this is a proven technology. None. The risk is low because of the technical expertise of the project developer. Including a payment support mechanism that backs NEVLEC’s payments under the PPA, and the development banks’ involvement, reduces the project’s political and social risk. Also, if electricity prices are reduced through the use of geothermal energy, the public will likely support the project. This risk can be reduced by carrying out an EIA. The EIA will allow NIA to assess the risk of the geothermal project and propose an action plan to mitigate the risks identified. The financing risk is reduced with the PPA, the payment support mechanism for NEVLEC’s payments under the PPA, and potentially financing from development banks. The risk is low because the rules governing the sustainable exploitation of the resource should already be established in the Geothermal Ordinance. If this is not the case, the NIA is responsible for making any necessary changes to the legal and regulatory framework to enable the development of the project. Since those changes take time, the parties to the project can draft clear rules governing the sustainable exploitation of the resource and the operation of the power plant in the project agreements (concession, PPA, others). Risk Impact Party That the Risk Is Proposed Measure for of Risk Assigned To Mitigating the Risk Medium Low Medium Low Low Low Medium Medium NEVLEC and SPV NIA and SPVt SPV and, possibly, the construction company that builds the plant SPV SPV SPV SPV and NIA SPV and NIA Low NIA 158

PDF Image | Unlocking Geothermal Power Eastern Caribbean Powerhouse

PDF Search Title:

Unlocking Geothermal Power Eastern Caribbean Powerhouse

Original File Name Searched:

Eastern-Caribbean-Geothermal-Powerhouse.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)