logo

Viktor Schauberger Work Explained

PDF Publication Title:

Viktor Schauberger Work Explained ( viktor-schauberger-work-explained )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 032

26 Living Energies others to a nearby office for further detailed discussion of the project. Both Viktor and Walter had many questions arising from the previous meeting and urgently asked for more information and clarification. Their questions were brushed aside, how- ever, and they were told that these would be answered at the next conference. On the way back to their quarters, Viktor confided to Walter that he was going to insist that he be returned to Austria after the agreed three months had passed, otherwise he would henceforth remain silent. When Gerch- sheimer appeared the next day Viktor at once informed him that, since they had bro- ken their agreement with him, he would remain silent and would not cooperate in the project. About three days after this 2nd meeting, Viktor having returned to hospital, Walter accompanied Gerchsheimer on a trip to Colorado Springs for a decisive 3rd meeting with Donner and executives of the Eastern Oil Company and Trunk Line Company. Attended by their scientific advisers, they had flown specially from New Mexico for the meeting to be held on the following day. While Gerchsheimer stayed with Donner, Walter was put up at a nearby hotel, Gerchsheimer having lent him his imported white Mercedes to drive to the meeting at the Broadmoor Hotel in the morning. The meet- ing took place as scheduled, but without Walter's attendance. Instead he had appar- ently driven up to the top of the famous Pike's Peak (about 14,000 ft), returning from there only in the late afternoon. When he eventually arrived at the Broadmoor Hotel Gerchsheimer was almost speechless with fury, because Walter's attendance had been crucial to the success of the conference, which in his absence had been a total fiasco. Demanding an explanation, Walter appar- ently answered that he had simply forgotten. This only added fuel to Gerchsheimer's fire, because Walter was an intelligent man and his non-attendance could therefore not have been an accident. Why Walter did this will never be known. Perhaps he was motivated by his and Viktor's desire to withhold any further information on implosive nuclear energies. Whatever the reason, it effectively scuttled the whole project. Donner was equally furious and after ordering Gerch- sheimer to send the Schaubergers home at once, instructed his lawyer, Mr Ross, to draw up a final contract for the Schauberger's immediate signature. Two days later on the 13th of September at about 5 pm, Viktor and Walter were col- lected by Gerchsheimer for the fourth and final meeting, which took place in Totten's office. While Totten looked on grimly from behind his desk, Donner sat at a small table in the middle of the room. When Viktor entered he was shown to a seat opposite Donner, the remaining com- pany, Gerchsheimer, Donner's lawyer and Walter standing at the back of the room, Donner then signed a document in front of Viktor and passed his golden pen over for Viktor's signature. Picking up the document Gerchsheimer handed it to Viktor and announced that it had been decided to permit his return to Austria, the only stipula- tion being that he should countersign the document. At first Viktor demurred, because it was written in English, a language he could neither read nor understand. Looking to Walter for help, an argument then broke out between Walter and Gerchsheimer, Walter insisting that the document be trans- lated into German so that Viktor would know what he was supposed to sign. Gerchsheimer became extremely irritated at this and asked Walter to keep silent. He then turned to Viktor and assured him that he could safely sign the document unread, for with its signing all his wishes would be fulfilled. At this point Gerchsheimer reminded Donner that they had to be at the airport in ten minutes, whereupon Walter demanded that the contents of the 'contract' should at least be translated to Viktor orally. By this time in a state of semi mental paralysis born of his desperation to return home and to get the whole matter over quickly, Viktor told Walter that he wanted to sign the agreement whatever it contained. Walter then asked Gerchsheimer for a copy of the document, so that he could check as far as he was able, the

PDF Image | Viktor Schauberger Work Explained

viktor-schauberger-work-explained-032

PDF Search Title:

Viktor Schauberger Work Explained

Original File Name Searched:

Viktor_Schauberger_Living_Energies.pdf

DIY PDF Search: Google It | Yahoo | Bing

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

IT XR Project Redstone NFT Available for Sale: NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Be part of the future with this NFT. Can be bought and sold but only one design NFT exists. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Turbine IT XR Project Redstone Design: NFT for sale... NFT for high tech turbine design with one part 3D printed counter-rotating energy turbine. Includes all rights to this turbine design, including license for Fluid Handling Block I and II for the turbine assembly and housing. The NFT includes the blueprints (cad/cam), revenue streams, and all future development of the IT XR Project Redstone... More Info

Infinity Turbine ROT Radial Outflow Turbine 24 Design and Worldwide Rights: NFT for sale... NFT for the ROT 24 energy turbine. Be part of the future with this NFT. This design can be bought and sold but only one design NFT exists. You may manufacture the unit, or get the revenues from its sale from Infinity Turbine. Royalties go to the developer (Infinity) to keep enhancing design and applications... More Info

Infinity Supercritical CO2 10 Liter Extractor Design and Worldwide Rights: The Infinity Supercritical 10L CO2 extractor is for botanical oil extraction, which is rich in terpenes and can produce shelf ready full spectrum oil. With over 5 years of development, this industry leader mature extractor machine has been sold since 2015 and is part of many profitable businesses. The process can also be used for electrowinning, e-waste recycling, and lithium battery recycling, gold mining electronic wastes, precious metals. CO2 can also be used in a reverse fuel cell with nafion to make a gas-to-liquids fuel, such as methanol, ethanol and butanol or ethylene. Supercritical CO2 has also been used for treating nafion to make it more effective catalyst. This NFT is for the purchase of worldwide rights which includes the design. More Info

NFT (Non Fungible Token): Buy our tech, design, development or system NFT and become part of our tech NFT network... More Info

Infinity Turbine Products: Special for this month, any plans are $10,000 for complete Cad/Cam blueprints. License is for one build. Try before you buy a production license. May pay by Bitcoin or other Crypto. Products Page... More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP