Heat pump installation Good Practice Guide

PDF Publication Title:

Heat pump installation Good Practice Guide ( heat-pump-installation-good-practice-guide )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 005

Figure 6.15 Figure 6.16 Table 6.1 Figure 6.17 Figure 6.18 Figure 6.19 Figure 6.20 Figure 6.21 Figure 6.22 Figure 6.23 Figure 6.24 Figure 6.25 Figure 7.1 Figure 7.2 Figure 7.3 Figure 7.4 Figure 7.5 Figure 7.6 Figure 7.7 Figure 7.8 Figure 7.9 Figure 7.10 Figure 7.11 Figure 7.12 Figure 7.13 Figure 7.14 Figure 7.15 Figure 7.16 Figure 7.17 Figure 7.18 Figure 7.19 Figure 7.20 Figure 7.21 Figure 7.22 Figure 7.23 Figure 7.24 Figure 7.25 Figure 7.26 Figure 7.27 Figure 7.28 Figure 7.29 Figure 7.30 Figure 7.31 Figure 7.32 Figure 7.33 Table 7.1 Table 7.2 Figure 9.1 Figure 9.2 Figure 9.3 Figure 9.4 Figure 9.5 Figure 10.1 Figure 12.1 Figure 12.2 Figure 12.3 Tighten connection (A) 30 Tighten connection (B) 30 Fixing spacings for copper tubing 31 Run pipe/cable across truss chord/ceiling joist 32 Notch the top plate and studs (A) 32 Notch the top plate and studs (B) 32 Fix galvanised mild steel strap to hold pipe/cable 33 Wedge the pipe cable end into the stud 33 Braze pipe ends closed 33 Fix galvanised mild steel strap to hold pipe/connection cable 33 Feed pipe/cables through building wrap 33 Seal pipes or sleeve 33 Maximum pipe length and height 35 Screw-fix installation plate 35 Drill a hole through the wall 36 Slope of wall penetration 36 Release the tubing and drainage hose 36 Feed the connecting cable through the wall 36 Tape tubing, drainage pipe and connecting cable together 36 Feed taped bundle through the hole 36 Attach unit to wall bracket (A) 37 Attach unit to wall bracket (B) 37 Ensure unit is securely seated 37 Taped pipes, drainage pipe and connection cable through hole 37 Expose flared pipe ends 37 Unobstructed gap under outdoor unit fixed on concrete pad cast in place 38 Concrete pad construction 38 Fixing unit to a timber deck 39 Pack with plastic shims to level 39 Wall-mounted unit on brackets – masonry wall 39 Bind insulation with vinyl tape 40 Tape drainage hose to drainage outlet 40 Install trunking neatly 41 Fit refrigerant piping, drainage pipe and connecting cable into trunking 41 Fill hole around piping with sealant 41 Seal around cover 41 Fit cover over opening 41 Apply oil to the back of the flare and the outdoor unit 42 Connect pipes and tighten flare nut 42 Tighten flare nut connections 42 Remove vacuum pump and gauges (A) 43 Remove vacuum pump and gauges (B) 43 Remove vacuum pump and gauges (C) 44 Progressively release the vacuum 44 Tighten valve caps 44 Single step, deep vacuum method 44 Triple evacuation method 44 Connect power supply cable to terminal block 47 Install lockable isolating switch (A) 47 Install lockable isolating switch (B) 48 Install lockable isolating switch (C) 48 Replace service cover to outdoor unit 48 Annual heat pump running costs 51 House plan used in case studies 56 House elevations A and B as used in case studies 56 House elevations C and D as used in case studies 56 5

PDF Image | Heat pump installation Good Practice Guide

PDF Search Title:

Heat pump installation Good Practice Guide

Original File Name Searched:

Good_practice_heat_pump_installation.pdf

DIY PDF Search: Google It | Yahoo | Bing

CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info

Heat Pumps CO2 ORC Heat Pump System Platform More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com (Standard Web Page)