logo

QAHV-N560YA-HPB

PDF Publication Title:

QAHV-N560YA-HPB ( qahv-n560ya-hpb )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 010

2. Unit Installation Units should be installed only by personnel certified by Mitsubishi Electric. • Securely fix the unit with bolts to keep the unit from falling down during earthquakes or due to strong winds. • Install the unit on a foundation made of concrete or iron. • Noise and vibrations from the unit may be transmitted through the floor and walls. Provide adequate protection against noise and vibration. • Build the foundation in such way that the corners of the installation legs are securely supported as shown in the figure below. When using rubber vibration isolators, make sure they are large enough to cover the entire width of the unit's legs. If the corners of the legs are not firmly seated, the legs may bend. • The projecting length of the anchor bolt should be less than 30 mm. • This unit is not designed to be installed using hole-in anchor bolts unless brackets are used to support the four corners of the unit. • The legs on the unit are detachable. • Detaching the legs Loosen the three screws on the legs to detach each leg (two each in the front and back). If the finish coat becomes damaged when detaching the legs, be sure to touch it up. Warning: • Be sure to install the unit on a surface strong enough to withstand its weight to keep the unit from falling down and causing injury. • Provide adequate protection against strong winds and earthquakes. Improper installation may cause the unit to fall down, resulting in personal injury. When building the foundation, take the floor strength, water drainage during operation, and piping and wiring routes into consideration. Precautions for routing the pipes and wires underneath the unit without detachable legs When routing the pipes and wires underneath the unit, make sure that the foundation will not block the piping access holes. Also, make sure the foundation is at least 100 mm high so that the piping can pass under the unit. A A B B A: M10 anchor bolt (field supply) B: Corner is not seated. C: Detachable leg D: Screws C D 10 ≤ 30 mm ≤ 30 mm

PDF Image | QAHV-N560YA-HPB

qahv-n560ya-hpb-010

PDF Search Title:

QAHV-N560YA-HPB

Original File Name Searched:

IBIM_WT08219X05_QAHV_N560YA_HPB_ML.pdf

DIY PDF Search: Google It | Yahoo | Bing

CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info

Heat Pumps CO2 ORC Heat Pump System Platform More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP