4Check the following. ↓ Check the checkbox.
□ All places with flow rate valve opening 1000 through 100 are 2 L or above?
If 2 L/min or below, air may not be bled out. Perform an air bleeding operation and water flow rate adjustment operation again.
□ When there are multiple units, the values of the same pump output opening and the same valve opening are not greater or less than those for other units by 10% and 2 L/min or more.
(In multiple-unit system, perform a water flow rate adjustment operation at the same time.)
□ All the values (item codes d01 through d09) are not “0” when the pump output opening is 16%. (Not whole air is bled out.)
(Note 1) Change SW2-9 and SW2-3 as a stopgap procedure as shown in the table below, and then turn the power on.
Close <------------------ Water flow rate adjust valve opening ------------------> Open
Pump output opening/water flow rate adjust valve opening
1600
1400
1200
1000
800
600
400
200
100
Flow rate (pump output opening 16%)
d01
d02
d03
d04
d05
d06
d07
d08
d09
Flow rate (pump output opening 27%)
d10
d11
d12
d13
d14
d15
d16
d17
d18
Flow rate (pump output opening 100%)
d19
d20
d21
d22
d23
d24
d25
d26
d27
Close <------------------ Water flow rate adjust valve opening ------------------> Open
Pump output opening/water flow rate adjust valve opening
1600
1400
1200
1000
800
600
400
200
100
Flow rate (pump output opening 16%)
Flow rate (pump output opening 27%)
Flow rate (pump output opening 100%)
Multiple unit change-over switch SW2-9
When startup operation has not completed OFF When startup operation has completed -
Local/internal change-over switch SW2-3
ON
-
(Note 2) The table below shows the water flow rate adjustment operation status in 4 figures when the PCB DIP switch is set as shown in Note 3.
Water flow rate adjustment operation status Not completed
Completed
In operation
(Note 3) PCB DIP switch settings
SW2 SW3
-10 -5 -6 -7 -8 -9 -10 ON OFF OFF OFF ON ON OFF
Display - - n g - - - g - i n g
36
PDF Image | QAHV-N560YA-HPB
PDF Search Title:
QAHV-N560YA-HPB
Original File Name Searched:
IBIM_WT08219X05_QAHV_N560YA_HPB_ML.pdf
DIY PDF Search: Google It | Yahoo | Bing
CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info
Heat Pumps CO2 ORC Heat Pump System Platform More Info
CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com
(Standard Web Page)