logo

QAHV-N560YA-HPB

PDF Publication Title:

QAHV-N560YA-HPB ( qahv-n560ya-hpb )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 036

3Press SWP1 or SWP2 to display the operation result (flow rate characteristic) corresponding each flow rate code ‘dxx’ in Table 1 and write them down. Table 1 4Check the following. ↓ Check the checkbox. □ All places with flow rate valve opening 1000 through 100 are 2 L or above? If 2 L/min or below, air may not be bled out. Perform an air bleeding operation and water flow rate adjustment operation again. □ When there are multiple units, the values of the same pump output opening and the same valve opening are not greater or less than those for other units by 10% and 2 L/min or more. (In multiple-unit system, perform a water flow rate adjustment operation at the same time.) □ All the values (item codes d01 through d09) are not “0” when the pump output opening is 16%. (Not whole air is bled out.) (Note 1) Change SW2-9 and SW2-3 as a stopgap procedure as shown in the table below, and then turn the power on. Close <------------------ Water flow rate adjust valve opening ------------------> Open Pump output opening/water flow rate adjust valve opening 1600 1400 1200 1000 800 600 400 200 100 Flow rate (pump output opening 16%) d01 d02 d03 d04 d05 d06 d07 d08 d09 Flow rate (pump output opening 27%) d10 d11 d12 d13 d14 d15 d16 d17 d18 Flow rate (pump output opening 100%) d19 d20 d21 d22 d23 d24 d25 d26 d27 Close <------------------ Water flow rate adjust valve opening ------------------> Open Pump output opening/water flow rate adjust valve opening 1600 1400 1200 1000 800 600 400 200 100 Flow rate (pump output opening 16%) Flow rate (pump output opening 27%) Flow rate (pump output opening 100%) Multiple unit change-over switch SW2-9 When startup operation has not completed OFF When startup operation has completed - Local/internal change-over switch SW2-3 ON - (Note 2) The table below shows the water flow rate adjustment operation status in 4 figures when the PCB DIP switch is set as shown in Note 3. Water flow rate adjustment operation status Not completed Completed In operation (Note 3) PCB DIP switch settings SW2 SW3 -10 -5 -6 -7 -8 -9 -10 ON OFF OFF OFF ON ON OFF Display - - n g - - - g - i n g 36

PDF Image | QAHV-N560YA-HPB

qahv-n560ya-hpb-036

PDF Search Title:

QAHV-N560YA-HPB

Original File Name Searched:

IBIM_WT08219X05_QAHV_N560YA_HPB_ML.pdf

DIY PDF Search: Google It | Yahoo | Bing

CO2 Organic Rankine Cycle Experimenter Platform The supercritical CO2 phase change system is both a heat pump and organic rankine cycle which can be used for those purposes and as a supercritical extractor for advanced subcritical and supercritical extraction technology. Uses include producing nanoparticles, precious metal CO2 extraction, lithium battery recycling, and other applications... More Info

Heat Pumps CO2 ORC Heat Pump System Platform More Info

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP