![]()
|
IT250 System Plans Infinity offers both the ROT turbine plans and the IT250 system plans as a separate package.We recommend the ROT24 for the IT250.Design Heat Exchangers ASME Rated Pressure - Evaporator R-245fa: 450 psi at 300 F shell side, and 150 psi 300 F on tube side. Welding procedures included. Condenser R-245fa: 450 psi at 250 F shell side, and 150 psi 250F on tube side. IT250 Revenue based on gross sales or savings, not including cost of acquiring waste heat flow or pumps.Revenue from IT250 (24 hours x 365 days per year x 250 kWh = 2,190,000 kWh per year):at $.20 per kWh = $438,000 USD per yearat $.40 per kWh = $876,000 USD per yearat $.80 per kWh = $1,752,000 USD per year IT System Flowchart
|
![]()
|
PureCycle The IT250 was designed in relation to the PureCycle system. Original UTC PureCycle Patent
|
Grid Tie Device Our induction AC generators require a grid tie device, which can be found on the link below from Sieb Meyer in Germany. Grid Tie Device |
CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP | PDF | IG |