IT50 Waste Heat to Power System ORC
IT50 System Performance
IT50 System Plans
Infinity offers both the ROT turbine plans and the IT50 system plans as a separate package.We recommend the ROT24 for the IT50, even if it is derated.Design Heat Exchangers ASME Rated Pressure - Evaporator R-245fa: 450 psi at 300 F shell side, and 150 psi 300 F on tube side. Welding procedures included. Condenser R-245fa: 450 psi at 250 F shell side, and 150 psi 250F on tube side. Turbine may be used most efficiently at 50 kW, but may also be used for a range of turbines from 30 kW to over 100 kW.IT50 Revenue based on gross sales or savings, not including cost of acquiring waste heat flow or pumps.Revenue from IT50 (24 hours x 365 days per year x 50 kWh = 438,000 kWh per year):at $.20 per kWh = $87,600 USD per yearat $.50 per kWh = $219,000 USD per yearat $1.00 per kWh = $438,000 USD per year
ROT24 Radial Outflow Turbine ROT ORC
IT50 Waste Heat to Power System ORC
IT50 Waste Heat to Power ORC
IT50 Build Plans
Build Plans
All licensing allows you to scale up or down in sizes, which allows you to build smaller systems, or number up for larger system capacities.
IT50 Electrical Conduit
IT50 System Control
IT50 Software
ROT24 Turbine Rotor and Stator
IT50 System
IT50 System Completed
INFINITY TURBINE | SALES | DESIGN | DEVELOPMENT | ANALYSIS CONSULTING
TEL: +1-608-238-6001 (Chicago Time Zone ) Email: greg@infinityturbine.com
GE Vernova Alternative: Supercritical CO2 Turbine Generator Multiple Modular Power Block MMPB Generators for Data Centers More Info
IT1000 Supercritical CO2 Gas Turbine Generator Silent Prime Power $3M 1 MW (natural gas, solar thermal, thermal battery heat) ... More Info
ORC and Products Index Infinity Turbine ORC Index... More Info
CONTACT TEL: +1-608-238-6001 (Chicago Time Zone USA) Email: greg@infinityturbine.com
(Standard Web Page) | PDF