All ORC and ROT Turbine Plans are $10,000 Each Most plans include unlimited production license. The larger IT250 and ROT 24 have additional license fees. More Info
Price List for IT Systems and Turbines 2024 Price list in pdf format More Info
IT250 System |
IT250 250-300 kW Waste Heat to Energy System The IT250 is designed to produce 250 kW net AC power (typically configured for a Grid-Tie connection). We have produced one IT250 system in the. They take about 6-12 months to complete, and can be shipped in a open top 20 ft. shipping container.IT250 Revenue based on gross sales or savings, not including cost of acquiring waste heat flow or pumps.Revenue from IT250 (24 hours x 365 days per year x 250 kWh = 2,190,000 kWh per year):at $.20 per kWh = $438,000 USD per yearat $.40 per kWh = $876,000 USD per yearat $.80 per kWh = $1,752,000 USD per year IT System Flowchart
|
IT250 On Site |
Induction or Synch Generator Our induction AC generators require a grid tie device, which can be found on the link below from Sieb Meyer in Germany. Grid Tie Device
|
IT250 System Turbine Similar to PureCycle System |
IT250 Feed Pump |
ROT24 Radial Inflow Turbine |