logo

IT250 Waste Heat to Power System ORC

TEL: 1-608-238-6001 Email: greg@infinityturbine.com

Salgenx Grid-Scale Battery 3000 kWh MegaWatt Pack | License and Build 3000 kWh battery using salt in a flow battery system available for $600,000 ... More Info

The Company That Controls Battery Technology Controls the World A Look at the New Contenders from Tesla to Salgenx Saltwater MegaWatt Pack...

Data Center Energy Strategies Using Cluster Mesh Power Generation Learn more about cooling and power strategies for Data Centers for the Cloud and AI... More Info

IT250 System

IT250 System

IT250 250-300 kW Waste Heat to Energy System

The IT250 is designed to produce 250 kW net AC power (typically configured for a Grid-Tie connection). We have produced one IT250 system in the. They take about 6-12 months to complete, and can be shipped in a open top 20 ft. shipping container.

IT250 Revenue based on gross sales or savings, not including cost of acquiring waste heat flow or pumps.

Revenue from IT250 (24 hours x 365 days per year x 250 kWh = 2,190,000 kWh per year):

at $.20 per kWh = $438,000 USD per year

at $.40 per kWh = $876,000 USD per year

at $.80 per kWh = $1,752,000 USD per year

IT System Flowchart

ROT24 Radial Outflow Turbine ROT ORC

IT250 Waste Heat to Power System ORC

IT250 On Site

IT250 On Site

Induction or Synch Generator

Our induction AC generators require a grid tie device, which can be found on the link below from Sieb Meyer in Germany.

Grid Tie Device

IT250 System Turbine Similar to PureCycle System

IT250 System Turbine Similar to PureCycle System

PureCycle 280 UTC Carrier Conversion from Chiller to ORC

IT250 Feed Pump

IT250 Feed Pump

ROT24 Radial Inflow Turbine

ROT24 Radial Inflow Turbine

ROT24 Radial Outflow Turbine ROT ORC

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP | PDF | IG | X.com