logo

IT250 Waste Heat to Power System ORC

TEL: 1-608-238-6001 Email: greg@infinityturbine.com

All ORC and ROT Turbine Plans are $10,000 Each Most plans include unlimited production license. The larger IT250 and ROT 24 have additional license fees. More Info

Price List for IT Systems and Turbines 2024 Price list in pdf format More Info

image

IT250 System Plans

Infinity offers both the ROT turbine plans and the IT250 system plans as a separate package.

We recommend the ROT24 for the IT250.

Design Heat Exchangers ASME Rated Pressure - Evaporator R-245fa: 450 psi at 300 F shell side, and 150 psi 300 F on tube side. Welding procedures included. Condenser R-245fa: 450 psi at 250 F shell side, and 150 psi 250F on tube side.

IT250 Revenue based on gross sales or savings, not including cost of acquiring waste heat flow or pumps.

Revenue from IT250 (24 hours x 365 days per year x 250 kWh = 2,190,000 kWh per year):

at $.20 per kWh = $438,000 USD per year

at $.40 per kWh = $876,000 USD per year

at $.80 per kWh = $1,752,000 USD per year

IT System Flowchart

image

PureCycle

The IT250 was designed in relation to the PureCycle system.

Original UTC PureCycle Patent

Grid Tie Device

Our induction AC generators require a grid tie device, which can be found on the link below from Sieb Meyer in Germany.

Grid Tie Device

CONTACT TEL: 608-238-6001 Email: greg@infinityturbine.com | RSS | AMP | PDF | IG | X.com