logo

IT250 Waste Heat to Power System ORC

INFINITY TURBINE | SALES | DESIGN | DEVELOPMENT | ANALYSIS CONSULTING

TEL: +1-608-238-6001 (Chicago Time Zone )

Email: greg@infinityturbine.com

40 MW to 100 MW Using IT1000 Supercritical CO2 Gas Turbine Generator Silent Prime Power 1 MW (natural gas, solar thermal, thermal battery heat) ... More Info

Developing Rack Prime Power DC for Server Racks Sidecar 48V to 800V DC plus DC buffer for hyperscalers... More Info

The Shift from AC to DC Power Production for AI Data Centers AI data centers are pushing electrical infrastructure to its limits. The traditional AC power chain is no longer optimal for GPU-driven workloads. A DC-native architecture using Infinity Turbine’s Cluster Mesh system offers a path to higher efficiency, lower costs, and scalable modular power—potentially saving tens of millions per year at hyperscale... More Info

SMR and Cluster Mesh Supercritical CO2 Power System Pairing Cluster Mesh Supercritical CO2 Power System with Small Modular Reactors enables hyperscalers to convert high-grade nuclear heat into ultra-efficient, dispatchable power with a compact, modular footprint tailored for AI-scale demand. More Info

ORC and Products Index Infinity Turbine ORC Index... More Info

________________________________________________________________________________

image

IT250 System Plans

Infinity offers both the ROT turbine plans and the IT250 system plans as a separate package.

We recommend the ROT24 for the IT250.

Design Heat Exchangers ASME Rated Pressure - Evaporator R-245fa: 450 psi at 300 F shell side, and 150 psi 300 F on tube side. Welding procedures included. Condenser R-245fa: 450 psi at 250 F shell side, and 150 psi 250F on tube side.

IT250 Revenue based on gross sales or savings, not including cost of acquiring waste heat flow or pumps.

Revenue from IT250 (24 hours x 365 days per year x 250 kWh = 2,190,000 kWh per year):

at $.20 per kWh = $438,000 USD per year

at $.40 per kWh = $876,000 USD per year

at $.80 per kWh = $1,752,000 USD per year

IT System Flowchart

image

PureCycle

The IT250 was designed in relation to the PureCycle system.

UTC Patent Chiller Conversion

Grid Tie Device

Our induction AC generators require a grid tie device, which can be found on the link below from Sieb Meyer in Germany.

Grid Tie Device

CONTACT TEL: +1-608-238-6001 (Chicago Time Zone USA) Email: greg@infinityturbine.com | AMP | PDF