logo

Power Needed For Bitcoin Crypto Mining

TEL: 1-608-238-6001 Email: greg@infinityturbine.com

Special Until October 2024: Turbine and ORC Licensing - Try Before You Buy Build one system or turbine-generator, then decide on the license More Info

Grid-Scale Saltwater Flow Battery by Salgenx 3000 kWh to 18 MWh The new competitor for the Tesla Megapack. Flow Battery using a variety of cathode materials which include Zinc, Bamboo, Vermiculite, and more. Mfg for less than $100/kWh. 3000 kWh Grid Scale Battery. Use for peaker plants or Data Centers. More Info

Data Center Energy Strategies Using Cluster Mesh Power Generation Learn more about CMPG for cooling and power strategies for Data Centers for the Cloud, AI, and Crypto More Info

Microturbine APP and Spreadsheet by Global Energy Global Energy has developed an App and Spreadsheet for Capstone Turbine and Capstone Green Energy microturbine parts where you can buy OEM supplier direct to save money on parts purchases especially for the C200... for iPhone, iPad, and desktop Mac/Windows More Info

ORC Radial Outflow Turbine Kit Infinity Turbine is now offering a ROT Radial Outflow Turbine for customer assembly flat pack kit. Save thousands compared to completed turbine generator... More Info

Data Centers Cooling and Power Strategies Technology Report More Info

Bitcoin using Nvidia GPU

To assess the amount of computing power and waste heat (BTUs) required to mine one Bitcoin using Nvidia GPUs, we need to consider several factors:

1. Bitcoin Mining Overview:

• Hash Rate: Bitcoin mining requires solving complex cryptographic puzzles, measured in hashes per second (H/s). The total computational power of the Bitcoin network is known as the hash rate.

• Difficulty: The mining difficulty adjusts approximately every two weeks to ensure that one block is mined roughly every 10 minutes. This impacts the amount of computational power needed to mine one Bitcoin.

• Block Reward: As of 2024, the block reward is 6.25 BTC per block.

2. Computing Power (Hash Rate) Required:

• The hash rate required to mine a single Bitcoin depends on the network's total hash rate and the current mining difficulty.

• Assuming the global Bitcoin hash rate is around 400 EH/s (exahashes per second) and that a single GPU, like the Nvidia A100, has a hash rate of 50 MH/s (megahashes per second) in a specific mining algorithm like Ethash (Ethereum mining algorithm, for example):

\[

\text{Proportion of the network's power from one GPU} = \frac{50 \text{ MH/s}}{400 \times 10^{12} \text{ H/s}} = 1.25 \times 10^{-13}

\]

\[

\text{Time to mine 1 BTC (on average) with one GPU} = \frac{10 \text{ minutes} \times 6.25 \text{ BTC}}{1.25 \times 10^{-13}} \approx 5 \times 10^{13} \text{ minutes}

\]

This means that a single Nvidia GPU would take an impractically long time to mine 1 BTC by itself. Therefore, mining operations use thousands of GPUs in parallel.

3. Energy (BTUs) Needed to Mine 1 BTC:

Assume the following:

• Power Consumption: Nvidia A100 GPU consumes approximately 300 watts.

• Mining Duration: For simplicity, let's estimate the time to mine 1 BTC using a large mining farm with GPUs contributing a significant portion of the network's total hash rate.

Let’s assume the time to mine 1 BTC is approximately 10 days for a sufficiently large farm using many GPUs.

Energy Consumption per GPU:

\[

\text{Energy per GPU} = 300 \text{ watts} \times 10 \times 24 \text{ hours/day} = 72,000 \text{ watt-hours} = 72 \text{ kWh}

\]

• Total BTU per GPU:

\[

\text{BTU per GPU} = 72 \text{ kWh} \times 3,412 \text{ BTU/kWh} = 245,664 \text{ BTU}

\]

If a large mining farm has, say, 10,000 GPUs, the total energy consumption would be:

\[

\text{Total BTU} = 245,664 \text{ BTU/GPU} \times 10,000 \text{ GPUs} = 2,456,640,000 \text{ BTU}

\]

4. Summary:

• Hash Rate: The amount of computing power required to mine 1 BTC is extremely high and typically involves the collective efforts of large mining farms.

• BTUs Required: For a large farm using around 10,000 Nvidia GPUs, approximately 2.46 billion BTUs would be required to mine a single Bitcoin, assuming a mining duration of about 10 days.

This calculation provides a general estimate. The actual energy required can vary based on factors like the current mining difficulty, network hash rate, and the specific hardware efficiency of the GPUs used in the mining operation.

image

kilowatt-hours (kWh) needed to mine one Bitcoin

To calculate the number of kilowatt-hours (kWh) needed to mine one Bitcoin, we'll start by estimating the energy consumption based on typical GPU power usage and the time required to mine a Bitcoin.

1. Assumptions:

• GPU Power Consumption: Let's assume each Nvidia GPU (e.g., A100) consumes approximately 300 watts (0.3 kW) of power.

• Hash Rate: As mentioned before, mining a Bitcoin with a single GPU would take an impractically long time. Instead, mining operations use thousands of GPUs in parallel.

• Time to Mine 1 Bitcoin: The time to mine 1 Bitcoin depends on the network's total hash rate and mining difficulty. For this example, let's assume a mining farm can mine 1 Bitcoin in approximately 10 days (240 hours) using a large number of GPUs.

2. Energy Consumption per GPU:

• Power Consumption: Each GPU consumes 0.3 kW.

• Time Duration: 240 hours to mine 1 Bitcoin.

\[

\text{Energy per GPU} = 0.3 \text{ kW} \times 240 \text{ hours} = 72 \text{ kWh}

\]

3. Total Energy Consumption for a Mining Farm:

• If a mining farm uses 10,000 GPUs, the total energy consumption would be:

\[

\text{Total Energy for 1 Bitcoin} = 72 \text{ kWh/GPU} \times 10,000 \text{ GPUs} = 720,000 \text{ kWh}

\]

4. Summary:

• Energy Consumption: A mining farm using 10,000 Nvidia GPUs would consume approximately 720,000 kWh to mine a single Bitcoin.

This number is an estimate and assumes a specific scale of operation (10,000 GPUs) and a 10-day mining period for 1 Bitcoin. The actual energy required can vary based on the efficiency of the mining hardware, the network difficulty, and the total hash rate of the Bitcoin network.

image

Cost of generating one Bitcoin

To calculate the cost of generating one Bitcoin, based on the electricity consumption and the cost per kilowatt-hour, we'll use the previous estimate of 720,000 kWh required to mine one Bitcoin and an electricity cost of $0.05 per kWh.

1. Electricity Consumption:

• Total Energy Consumption: 720,000 kWh per Bitcoin

2. Electricity Cost:

• Cost per kWh: $0.05

\[

\text{Total Cost} = 720,000 \text{ kWh} \times 0.05 \text{ USD/kWh} = 36,000 \text{ USD}

\]

Summary:

It would cost approximately $36,000 in electricity alone to mine one Bitcoin, assuming an energy consumption of 720,000 kWh and an electricity rate of $0.05 per kWh.

This estimate assumes constant mining conditions and does not account for other costs associated with mining, such as hardware depreciation, cooling, maintenance, or other operational expenses.

The Hidden Costs of Bitcoin: Understanding the Enormous Energy Demand and How Infinity Turbine’s Cluster Mesh Power Generation Can Help

In the world of cryptocurrencies, Bitcoin stands as the most prominent and valuable digital asset. However, as Bitcoin’s popularity and value continue to rise, so too does the amount of energy required to mine it. The process of mining Bitcoin is inherently energy-intensive, leading to growing concerns about its environmental impact and the inefficiencies associated with its production.

The Energy Inefficiency of Bitcoin Mining

Bitcoin mining involves solving complex mathematical puzzles, a process that requires substantial computational power. This power is supplied by mining hardware, often composed of thousands of GPUs (Graphics Processing Units) or specialized ASIC (Application-Specific Integrated Circuit) machines. The collective computational power of the Bitcoin network, known as the hash rate, has reached staggering levels, making it increasingly difficult to mine new Bitcoin.

As of today, the energy required to mine just one Bitcoin is staggering. A large-scale mining operation using approximately 10,000 Nvidia GPUs could consume around 720,000 kWh of electricity to mine a single Bitcoin. At an electricity cost of $0.05 per kWh, this translates to $36,000 in electricity costs alone. Given the current block reward and mining difficulty, the actual time and energy required could vary, but the figures remain eye-opening.

Environmental Impact: Millions of BTUs in Waste Heat

The inefficiency of Bitcoin mining is not only measured in kilowatt-hours but also in the heat generated as a byproduct of the energy consumed. The GPUs and ASIC machines used in mining convert nearly all of their electrical power into heat, producing millions of BTUs per hour. For example, a medium-sized mining operation generating 68.24 million BTU per hour of waste heat is not uncommon.

This waste heat must be dissipated to prevent the mining hardware from overheating, typically requiring extensive and energy-consuming cooling systems. Traditional cooling methods, such as using chillers, add another layer of inefficiency, consuming additional electricity and water resources.

Infinity Turbine’s Cluster Mesh Power Generation: A Sustainable Solution

Infinity Turbine offers a groundbreaking solution to the inefficiency problem of Bitcoin mining with its Cluster Mesh Power Generation System. This innovative system repurposes the enormous amount of waste heat generated by mining operations to produce clean electricity, thereby reducing the overall energy consumption and environmental footprint of Bitcoin mining centers.

How It Works:

• Heat Utilization: Instead of relying on conventional cooling systems, the Cluster Mesh Power Generation System captures the waste heat produced by mining GPUs and ASIC machines. This heat is used to power Organic Rankine Cycle (ORC) turbines, each capable of generating 5 kW of electricity.

• Modular and Scalable: The system is designed to be modular, allowing multiple ORC turbines to be connected in a mesh, similar to the configuration used in Tesla’s Megapack energy storage systems. This scalability ensures that the system can be tailored to the specific needs of any mining operation, whether small or large.

• Energy and Cost Savings: For a medium-sized Bitcoin mining operation, the system can generate approximately 3,412 kWh of power per hour from waste heat, leading to significant energy savings. Over the course of a year, this can translate to $1,494,696 in electricity savings and a reduction in the need for external power sources.

Beyond Energy: Water Conservation and Environmental Benefits

One of the most overlooked aspects of traditional cooling systems is their water consumption. Many data centers and mining operations use evaporative cooling, which consumes vast amounts of water. The Infinity Turbine system addresses this issue by providing an alternative cooling solution that does not rely on water, leading to substantial water savings.

For instance, a medium-sized data center using the Cluster Mesh Power Generation System can save approximately 2,592,000 liters of water per day, amounting to nearly 1 billion liters per year. This not only reduces operational costs but also aligns with global efforts to conserve water resources.

Conclusion: The Future of Sustainable Bitcoin Mining

The inefficiencies of Bitcoin mining, particularly in terms of energy consumption and environmental impact, are significant challenges that must be addressed as the cryptocurrency market continues to grow. Infinity Turbine’s Cluster Mesh Power Generation System offers a sustainable and innovative solution to these challenges by repurposing waste heat to generate electricity and reduce the overall energy footprint of mining operations.

By integrating such technologies, the Bitcoin mining industry can take meaningful steps toward sustainability, ensuring that the pursuit of digital wealth does not come at the expense of our planet’s resources.

Waste Heat to Power Savings for Crypto Mining

1. Total Cost of a 3000 kWh System

If each cell costs $20,000, and the system requires 600 cells:

\[

\text{Total Cost} = 600 \text{ cells} \times 20,000 \text{ USD/cell} = 12,000,000 \text{ USD}

\]

So, the total cost for a 3000 kWh system using 600 cells is $12,000,000.

2. Payback Period Calculation

To determine the payback period for the system, we'll compare the total cost with the annual savings in energy and cooling costs for small, medium, and large AI data centers.

Annual Savings from Cooling (based on earlier calculations):

• Small Data Center: Annual savings of $1,494,696

• Medium Data Center: Annual savings of $1,494,696

• Large Data Center: Annual savings of $3,756,840

3. Payback Period Calculation

For a Small Data Center:

\[

\text{Payback Period} = \frac{12,000,000 \text{ USD}}{1,494,696 \text{ USD/year}} \approx 8.03 \text{ years}

\]

For a Medium Data Center:

\[

\text{Payback Period} = \frac{12,000,000 \text{ USD}}{1,494,696 \text{ USD/year}} \approx 8.03 \text{ years}

\]

For a Large Data Center:

\[

\text{Payback Period} = \frac{12,000,000 \text{ USD}}{3,756,840 \text{ USD/year}} \approx 3.19 \text{ years}

\]

Summary of Payback Periods:

• Small Data Center: Approximately 8.03 years

• Medium Data Center: Approximately 8.03 years

• Large Data Center: Approximately 3.19 years

These payback periods indicate how long it would take for the cooling savings from the Cluster Mesh Power Generation System to offset the initial investment cost of $12 million. The large data center, due to its greater energy and cooling needs, benefits from a significantly shorter payback period.