Utility Grid Power Rate Arbitrage Mining Opportunity

Grid Power Rate Mining Opportunity

Utility energy mining, which allows early adopters to install containerized flow batteries to purchase off-peak power makes available for demand-side customers at a higher rate (basically arbitrage of energy rates). This leverages utility demand pricing and flipping energy storage. Selling back to the grid doesn't make sense, but providing power modules next to large manufacturing or energy users makes lots of sense.


Tax Credits

Home Based Flow Battery: 10-100 kW

$35 x 10 kW = $350

$35 x 100 kW = $3,500

Commercial Flow Battery: 4 MW

$35 x 4,000 kW = $140,000

Utility Scale Flow Battery Bank:

$35 x 4,000 kW x 100 = $14,000,000

Note: The credit would apply to components produced and sold after December 31, 2022, and would begin to phase out starting in 2030. Access: Electrochemical cell comprised of one or more positive electrodes and one or more negative electrodes, with an energy density of not less than 100 watt-hours per liter (.1 kW/L), and capable of storing at least 20 watt-hours of energy.

Inflation Reduction Act of 2022 – New Tax Credits for Manufacturers of Clean Energy Equipment


INFINITY TURBINE | SALES | DESIGN | DEVELOPMENT | ANALYSIS CONSULTING

TEL: +1-608-238-6001 (Chicago Time Zone ) Email: greg@infinityturbine.com

GE Vernova Alternative: Supercritical CO2 Turbine Generator Multiple Modular Power Block MMPB Generators for Data Centers More Info

IT1000 Supercritical CO2 Gas Turbine Generator Silent Prime Power $3M 1 MW (natural gas, solar thermal, thermal battery heat) ... More Info

ORC and Products Index Infinity Turbine ORC Index... More Info

CONTACT TEL: +1-608-238-6001 (Chicago Time Zone USA) Email: greg@infinityturbine.com (Standard Web Page) | PDF