Infinity Turbine Sales | Plans | Consulting TEL: 1-608-238-6001 Email: greg@infinityturbine.com
For Data Centers Gas Turbine Waste Heat to Power Owners of Cat Solar Gas Turbine Generators and the new Boom Aero Derivative Gas Turbines Generators: Take your waste heat and make additional Combined Cycle power or generate cooling for your data center... More Info
IT250 Supercritical CO2 Gas Turbine Generator Silent Prime Power $999,000 250 kW (natural gas, solar thermal, thermal battery heat) ... More Info
IT1000 Supercritical CO2 Gas Turbine Generator Silent Prime Power $3M 1 MW (natural gas, solar thermal, thermal battery heat) ... More Info
IT50MW Supercritical CO2 Gas Turbine Generator Silent Prime Power $50M (natural gas, solar thermal, thermal battery heat) ... More Info
Data Center Consulting Prime power and energy consulting for AI and data centers... More Info
Quantum Super Turbine... Developing in 2026: High efficiency topping cycle turbine generator with bottoming cycle cooling, specifically designed for Data Centers with back-end combined cycle modules for cooling, hydraulic, or heat pump capabilities... More Info
|
Payback and Cost Savings of a 10 MW Power Station What is the return on investment for a 10 MW power block priced at $10 million? By analyzing electricity values at $0.10 per kilowatt hour, we can calculate revenue and payback timelines that highlight the financial advantages of this scale of energy generation.IntroductionLarge-scale power generation is a capital-intensive business, but the financial returns can be significant when electricity is valued at standard market rates. A 10 MW power station offers not only a substantial supply of electricity but also rapid investment recovery under favorable pricing conditions.Revenue Calculations at $0.10 per Kilowatt HourOperating at full capacity, a 10 MW system produces 10,000 kilowatts each hour. At $0.10 per kilowatt hour, the cost savings or revenue potential is straightforward to calculate:Per Hour: $1,000Per Day (24 hours): $24,000Per Month (30 days): $720,000Per Month (31 days): $744,000Per Year (365 days): $8,760,000Payback Period on a $10 Million InvestmentWith annual gross revenue potential of $8.76 million, the capital investment of $10 million is recovered in approximately 1.14 years, or about 417 days. This translates to just under 14 months for a full payback under continuous operation.Strategic ImpactThe economics demonstrate the strength of deploying 10 MW scale power blocks for applications where stable pricing and high capacity factors can be achieved. Whether supplying a data center, grid support, or industrial demand, this size of installation can deliver rapid financial returns while ensuring long-term energy reliability. |
| CONTACT TEL: 1-608-238-6001 Email: greg@infinityturbine.com | AMP | PDF |